Overview
Global Energy Monitor tracks 7 units or phases at this site (operating 1.92 GW, shelved / mothballed 770 MW, retired 75 MW).
Technology: combined cycle, subcritical; fuel: natural gas, coal: bituminous.
Ownership: China Huaneng Group Co Ltd North China Branch (parent company: China Huaneng Group Co Ltd).
Its 2 operating units were commissioned between 2011 and 2017. 1 units have already been retired (2017).
Why it matters
- The 11th-largest oil- and gas-fired power station in China by capacity (of 361 operating oil & gas facilities tracked).
- Provides about 1% of China's operating oil & gas capacity.
- At a typical capacity factor of 40% for this technology, it would generate roughly 6.7 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in China
China has 193.9 GW of operating oil & gas capacity across 361 plants in the Global Energy Monitor dataset — 6.3% of the country's total operating power capacity of 3,086.2 GW.
The oil & gas pipeline in China includes 24.6 GW under construction and 64.9 GW at earlier planning stages.
Other major oil & gas plants in China include Sichuan Suining Anju Natural Gas power station (2.80 GW), Yudean Huizhou Gas power station (2.55 GW) and Dongguan Ningzhou Gas power station (2.48 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 2 | 924 MW | combined cycle | 2011 | ||
| 3 | 998 MW | combined cycle | 2017 | ||
| Unit 1 | 75 MW | Retired | subcritical | 2017 | |
| Unit 2 | 165 MW | Mothballed | subcritical | 1999 | |
| Unit 3 | 165 MW | Mothballed | subcritical | 1999 | |
| Unit 4 | 220 MW | Mothballed | subcritical | 1999 | |
| Unit 5 | 220 MW | Mothballed | subcritical | 1999 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Huaneng Beijing power station
Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Location
Huaneng Beijing power station is located in Beijing, China, at approximately 39.8854, 116.5354. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Huaneng Beijing power station is owned by China Huaneng Group Co Ltd North China Branch. The ultimate parent company is China Huaneng Group Co Ltd. Across the dataset, China Huaneng Group Co Ltd is linked to 193 power plants in 4 countries, with 98.0 GW of operating capacity.
Frequently asked questions
What is the capacity of Huaneng Beijing power station?
Huaneng Beijing power station has a capacity of 1.92 GW according to the latest Global Energy Monitor data. This figure covers the 7 units or phases listed for the site.
What type of facility is Huaneng Beijing power station?
Huaneng Beijing power station is a oil- and gas-fired power station. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Who owns Huaneng Beijing power station?
Huaneng Beijing power station is owned by China Huaneng Group Co Ltd North China Branch. The ultimate parent company is China Huaneng Group Co Ltd.
Where is Huaneng Beijing power station located?
It is located in Beijing, China. Approximate coordinates: 39.8854, 116.5354.
Is Huaneng Beijing power station operational?
According to the latest data, Huaneng Beijing power station is in operation. Operating means the facility is built and in commercial service.
When did Huaneng Beijing power station start operating?
Start year: 2011. Current status: Operating. Its 2 operating units were commissioned between 2011 and 2017. 1 units have already been retired (2017).
How much electricity does Huaneng Beijing power station generate?
Actual output data are not published for every plant. As an indicative estimate, Huaneng Beijing power station would produce about 6.7 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Huaneng Beijing power station compared with other facilities in China?
Huaneng Beijing power station ranks #11 by capacity among 361 comparable oil & gas facilities tracked in China.