Overview
Technology: run-of-river.
Ownership: China Huaneng Group Co Ltd.
Why it matters
- The largest hydropower plant in China by capacity, out of 1403 operating, under-construction and planned hydropower facilities tracked in the country.
- If completed, it would add 60.0 GW to China's hydropower fleet — equivalent to 16% of today's operating hydropower capacity.
- Ranks #1 worldwide among hydropower facilities of the same status group by capacity.
Hydropower provides renewable electricity and, where reservoirs exist, dispatchable output and storage that help stabilise the grid; output varies with rainfall and river flows.
Hydropower power in China
China has 372.5 GW of operating hydropower capacity across 1,006 plants in the Global Energy Monitor dataset — 12% of the country's total operating power capacity of 3,086.2 GW.
The hydropower pipeline in China includes 241.1 GW under construction and 321.5 GW at earlier planning stages.
Other major hydropower plants in China include Three Gorges Dam hydroelectric plant (22.5 GW), Baihetan hydroelectric plant (16.0 GW) and Xiluodu hydroelectric plant (13.9 GW).
How hydropower plants work
Hydropower plants convert the energy of falling or flowing water into electricity: water passes through turbines placed at the foot of a dam or along a diversion channel, and the turbines drive generators. Output depends on the height of the water drop (the head) and the volume of water flowing.
Reservoir and pumped-storage schemes can store energy and release it within minutes, which makes hydropower one of the most flexible sources on the grid. Annual generation varies with rainfall and snowmelt, and large dams can have significant effects on river ecosystems and downstream water use.
Technology at Motuo hydroelectric plant
Run-of-river plants use the natural flow of a river with little or no storage, so output follows seasonal water levels.
Location
Motuo hydroelectric plant is located in Tibet, China, at approximately 29.1808, 95.0090. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Motuo hydroelectric plant is owned by China Huaneng Group Co Ltd. Across the dataset, China Huaneng Group Co Ltd is linked to 193 power plants in 4 countries, with 98.0 GW of operating capacity.
Frequently asked questions
What is the capacity of Motuo hydroelectric plant?
Motuo hydroelectric plant has a capacity of 60.0 GW according to the latest Global Energy Monitor data.
What type of facility is Motuo hydroelectric plant?
Motuo hydroelectric plant is a hydropower plant. Run-of-river plants use the natural flow of a river with little or no storage, so output follows seasonal water levels.
Who owns Motuo hydroelectric plant?
Motuo hydroelectric plant is owned by China Huaneng Group Co Ltd.
Where is Motuo hydroelectric plant located?
It is located in Tibet, China. Approximate coordinates: 29.1808, 95.0090.
Is Motuo hydroelectric plant operational?
According to the latest data, Motuo hydroelectric plant is under construction. Under construction means physical work has started on site but the facility is not yet in commercial service.
When is Motuo hydroelectric plant expected to start?
Start year: 2045. Current status: Construction.
How big is Motuo hydroelectric plant compared with other facilities in China?
Motuo hydroelectric plant ranks #1 by capacity among 1403 comparable hydropower facilities tracked in China.