Overview
Global Energy Monitor tracks 6 units or phases at this site (operating 1.92 GW, under construction 2.10 GW).
Technology: subcritical, ultra-supercritical; fuel: coal: bituminous, coal: unknown.
Ownership: State Power Investment Group Chongqing Hechuan Power Generation Co Ltd (parent company: State Power Investment Corp Ltd; China Resources Power Holdings Co Ltd; unknown; Chongqing Construction Investment (Group) Co Ltd; Agricultural Bank of China…).
Its 4 operating units were commissioned between 2006 and 2014. 2 further units or phases are scheduled to come online in 2026.
Why it matters
- At a typical capacity factor of 50% for this technology, it would generate roughly 8.4 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in China
China has 1,259.6 GW of operating coal capacity across 1,188 plants in the Global Energy Monitor dataset — 41% of the country's total operating power capacity of 3,086.2 GW.
The coal pipeline in China includes 93.1 GW under construction and 145.8 GW at earlier planning stages.
Other major coal plants in China include Beilun power station (7.10 GW), Pingwei power station (6.54 GW) and Togtoh power station (6.12 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Phase I Unit 1 | 300 MW | subcritical | 2006 | ||
| Phase I Unit 2 | 300 MW | subcritical | 2006 | ||
| Phase II Unit 3 | 660 MW | ultra-supercritical | 2013 | ||
| Phase II Unit 4 | 660 MW | ultra-supercritical | 2014 | ||
| Phase III Unit 5 | 1.05 GW | Construction | ultra-supercritical | 2026 | |
| Phase III Unit 6 | 1.05 GW | Construction | ultra-supercritical | 2026 |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Chongqing Shuanghuai power station
Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Location
Chongqing Shuanghuai power station is located in Chongqing, China, at approximately 30.1611, 106.5481. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Chongqing Shuanghuai power station is owned by State Power Investment Group Chongqing Hechuan Power Generation Co Ltd. The ultimate parent company is State Power Investment Corp Ltd; China Resources Power Holdings Co Ltd; unknown; Chongqing Construction Investment (Group) Co Ltd; Agricultural Bank of China Ltd; China Development Bank Corp…. Across the dataset, State Power Investment Corp Ltd is linked to 163 power plants in 5 countries, with 82.9 GW of operating capacity.
Frequently asked questions
What is the capacity of Chongqing Shuanghuai power station?
Chongqing Shuanghuai power station has a capacity of 1.92 GW according to the latest Global Energy Monitor data. This figure covers the 6 units or phases listed for the site.
What type of facility is Chongqing Shuanghuai power station?
Chongqing Shuanghuai power station is a coal-fired power station. Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%.
Who owns Chongqing Shuanghuai power station?
Chongqing Shuanghuai power station is owned by State Power Investment Group Chongqing Hechuan Power Generation Co Ltd. The ultimate parent company is State Power Investment Corp Ltd; China Resources Power Holdings Co Ltd; unknown; Chongqing Construction Investment (Group) Co Ltd; Agricultural Bank of China Ltd; China Development Bank Corp….
Where is Chongqing Shuanghuai power station located?
It is located in Chongqing, China. Approximate coordinates: 30.1611, 106.5481.
Is Chongqing Shuanghuai power station operational?
According to the latest data, Chongqing Shuanghuai power station is in operation. Operating means the facility is built and in commercial service.
When did Chongqing Shuanghuai power station start operating?
Start year: 2006. Current status: Operating. Its 4 operating units were commissioned between 2006 and 2014. 2 further units or phases are scheduled to come online in 2026.
How much electricity does Chongqing Shuanghuai power station generate?
Actual output data are not published for every plant. As an indicative estimate, Chongqing Shuanghuai power station would produce about 8.4 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is Chongqing Shuanghuai power station compared with other facilities in China?
Chongqing Shuanghuai power station ranks #201 by capacity among 1188 comparable coal facilities tracked in China.