Genelba power station is a 1.25 GW oil- and gas-fired power station located in Buenos Aires, Argentina. The facility is currently in operation, with its first unit entering service in 1999.

1.25 GWCapacity
OperatingStatus
1999Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 3 units or phases at this site (operating 1.25 GW).

Technology: combined cycle, gas turbine; fuel: natural gas.

Ownership: Pampa Energia SA.

Its 2 operating units were commissioned between 1999 and 2020.

Why it matters

  • The 4th-largest oil- and gas-fired power station in Argentina by capacity (of 57 operating oil & gas facilities tracked).
  • Provides about 5.4% of Argentina's operating oil & gas capacity and roughly 2.7% of all operating power capacity in the country in the dataset.
  • At a typical capacity factor of 40% for this technology, it would generate roughly 4.4 TWh of electricity a year (indicative estimate).

Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.

Oil & gas power in Argentina

Argentina has 23.1 GW of operating oil & gas capacity across 57 plants in the Global Energy Monitor dataset — 50% of the country's total operating power capacity of 46.0 GW.

Other major oil & gas plants in Argentina include Costanera power station (2.30 GW), Puerto power station (1.75 GW) and Tucumán power station (1.30 GW).

See the full list: Gas & oil power plants in Argentina →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
CC-1 684 MW Operating combined cycle 1999
CC-2 569 MW Operating combined cycle 2020
Genelba III 300 MW Cancelled gas turbine

How gas & oil power plants work

Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.

Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.

Technology at Genelba power station

Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant. Open-cycle gas turbines can start within minutes and are mainly used as peaking plants, at efficiencies of roughly 30–40%.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Genelba power station is located in Buenos Aires, Argentina, at approximately -34.9022, -58.7333. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Genelba power station is owned by Pampa Energia SA. Across the dataset, Pampa Energia SA is linked to 18 power plants with 7.12 GW of operating capacity.

Frequently asked questions

What is the capacity of Genelba power station?

Genelba power station has a capacity of 1.25 GW according to the latest Global Energy Monitor data. This figure covers the 3 units or phases listed for the site.

What type of facility is Genelba power station?

Genelba power station is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.

Who owns Genelba power station?

Genelba power station is owned by Pampa Energia SA.

Where is Genelba power station located?

It is located in Buenos Aires, Argentina. Approximate coordinates: -34.9022, -58.7333.

Is Genelba power station operational?

According to the latest data, Genelba power station is in operation. Operating means the facility is built and in commercial service.

When did Genelba power station start operating?

Start year: 1999. Current status: Operating. Its 2 operating units were commissioned between 1999 and 2020.

How much electricity does Genelba power station generate?

Actual output data are not published for every plant. As an indicative estimate, Genelba power station would produce about 4.4 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.

How big is Genelba power station compared with other facilities in Argentina?

Genelba power station ranks #4 by capacity among 57 comparable oil & gas facilities tracked in Argentina.

Nearby energy infrastructure

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects