Overview
Global Energy Monitor tracks 7 units or phases at this site (operating 1.11 GW, planned 1.20 GW, shelved / mothballed 1.15 GW).
Technology: pressurized heavy water reactor, pressurized water reactor, small modular reactor.
Ownership: Nucleoelectrica Argentina SA.
Its 2 operating units were commissioned between 1974 and 2016. 1 further units or phases are scheduled to come online in 2030.
Why it matters
- The largest nuclear power plant in Argentina by capacity, out of 2 operating nuclear facilities tracked in the country.
- Provides about 63% of Argentina's operating nuclear capacity and roughly 2.4% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 85% for this technology, it would generate roughly 8.2 TWh of electricity a year (indicative estimate).
Nuclear plants supply large volumes of low-carbon baseload electricity with very high capacity factors, so a single station can cover a significant share of national demand.
Nuclear power in Argentina
Argentina has 1.76 GW of operating nuclear capacity across 2 plants in the Global Energy Monitor dataset — 3.8% of the country's total operating power capacity of 46.0 GW.
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 | 362 MW | pressurized heavy water reactor | 1974 | ||
| 2 | 745 MW | pressurized heavy water reactor | 2016 | ||
| 3 | 1.15 GW | Shelved | pressurized water reactor | ||
| SMR 1 | 300 MW | Announced | small modular reactor | 2030 | |
| SMR 2 | 300 MW | Announced | small modular reactor | ||
| SMR 3 | 300 MW | Announced | small modular reactor | ||
| SMR 4 | 300 MW | Announced | small modular reactor |
How nuclear power plants work
A nuclear power plant uses heat from controlled fission of uranium (or plutonium) fuel in a reactor core to produce steam, which drives a turbine-generator in the same way as a thermal power station. The reactor is surrounded by multiple safety barriers and a containment building.
Nuclear units typically run more than 90% of the hours in a year, so a single large reactor can supply several terawatt-hours of almost carbon-free electricity annually. Construction times are long and capital costs high, but fuel costs are low and plants are often licensed to operate for 60 years or more.
Technology at Atucha nuclear power plant
Pressurised water reactors (PWR), the most common reactor type worldwide, keep the primary coolant under high pressure and transfer its heat to a separate steam circuit. Pressurised heavy water reactors (PHWR), such as the CANDU design, use heavy water as moderator and coolant and can run on natural uranium.
Location
Atucha nuclear power plant is located in Buenos Aires, Argentina, at approximately -33.9672, -59.2075. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Atucha nuclear power plant is owned by Nucleoelectrica Argentina SA. Across the dataset, Nucleoelectrica Argentina SA is linked to 2 power plants with 1.76 GW of operating capacity.
Frequently asked questions
What is the capacity of Atucha nuclear power plant?
Atucha nuclear power plant has a capacity of 1.11 GW according to the latest Global Energy Monitor data. This figure covers the 7 units or phases listed for the site.
What type of facility is Atucha nuclear power plant?
Atucha nuclear power plant is a nuclear power plant. Pressurised water reactors (PWR), the most common reactor type worldwide, keep the primary coolant under high pressure and transfer its heat to a separate steam circuit.
Who owns Atucha nuclear power plant?
Atucha nuclear power plant is owned by Nucleoelectrica Argentina SA.
Where is Atucha nuclear power plant located?
It is located in Buenos Aires, Argentina. Approximate coordinates: -33.9672, -59.2075.
Is Atucha nuclear power plant operational?
According to the latest data, Atucha nuclear power plant is in operation. Operating means the facility is built and in commercial service.
When did Atucha nuclear power plant start operating?
Start year: 1974. Current status: Operating. Its 2 operating units were commissioned between 1974 and 2016. 1 further units or phases are scheduled to come online in 2030.
How much electricity does Atucha nuclear power plant generate?
Actual output data are not published for every plant. As an indicative estimate, Atucha nuclear power plant would produce about 8.2 TWh a year, assuming a capacity factor of 85%, which is typical for this technology.
How big is Atucha nuclear power plant compared with other facilities in Argentina?
Atucha nuclear power plant ranks #1 by capacity among 2 comparable nuclear facilities tracked in Argentina.