Overview
Global Energy Monitor tracks 6 units or phases at this site (operating 3.45 GW, retired 964 MW).
Technology: combined cycle, subcritical; fuel: natural gas, coal: bituminous.
Ownership: Duke Energy Florida LLC (parent company: Duke Energy Corp).
Its 4 operating units were commissioned between 1982 and 2018. 2 units have already been retired (2018). 2 operating units have a planned retirement date, the earliest in 2034.
Why it matters
- The 2nd-largest oil- and gas-fired power station in United States by capacity (of 1106 operating oil & gas facilities tracked).
- Ranks #33 worldwide among oil & gas facilities of the same status group by capacity.
- At a typical capacity factor of 40% for this technology, it would generate roughly 12 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in United States
United States has 590.9 GW of operating oil & gas capacity across 1,106 plants in the Global Energy Monitor dataset — 46% of the country's total operating power capacity of 1,280.9 GW.
The oil & gas pipeline in United States includes 29.4 GW under construction and 257.6 GW at earlier planning stages.
Other major oil & gas plants in United States include West County energy center (4.26 GW), Bruce Mansfield power station (3.64 GW) and Gibson Generating Station (3.34 GW).
See the full list: Gas & oil power plants in United States →
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| CC1 | 985 MW | combined cycle | 2018 | ||
| CC2 | 985 MW | combined cycle | 2018 | ||
| Unit 1 | 441 MW | Retired | subcritical | 1966 | 2018 |
| Unit 2 | 524 MW | Retired | subcritical | 1969 | 2018 |
| Unit 4 | 739 MW | subcritical | 1982 | 2034 | |
| Unit 5 | 739 MW | subcritical | 1984 | 2034 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Crystal River Energy Complex
Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Location
Crystal River Energy Complex is located in Florida, United States, at approximately 28.9570, -82.7006. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Crystal River Energy Complex is owned by Duke Energy Florida LLC. The ultimate parent company is Duke Energy Corp. Across the dataset, Duke Energy Corp is linked to 125 power plants with 53.8 GW of operating capacity.
Frequently asked questions
What is the capacity of Crystal River Energy Complex?
Crystal River Energy Complex has a capacity of 3.45 GW according to the latest Global Energy Monitor data. This figure covers the 6 units or phases listed for the site.
What type of facility is Crystal River Energy Complex?
Crystal River Energy Complex is a oil- and gas-fired power station. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Who owns Crystal River Energy Complex?
Crystal River Energy Complex is owned by Duke Energy Florida LLC. The ultimate parent company is Duke Energy Corp.
Where is Crystal River Energy Complex located?
It is located in Florida, United States. Approximate coordinates: 28.9570, -82.7006.
Is Crystal River Energy Complex operational?
According to the latest data, Crystal River Energy Complex is in operation. Operating means the facility is built and in commercial service.
When did Crystal River Energy Complex start operating?
Start year: 1982. Current status: Operating. Its 4 operating units were commissioned between 1982 and 2018. 2 units have already been retired (2018). 2 operating units have a planned retirement date, the earliest in 2034.
How much electricity does Crystal River Energy Complex generate?
Actual output data are not published for every plant. As an indicative estimate, Crystal River Energy Complex would produce about 12 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Crystal River Energy Complex compared with other facilities in United States?
Crystal River Energy Complex ranks #2 by capacity among 1106 comparable oil & gas facilities tracked in United States.