Wind · United States

Chokecherry And Sierra Madre Wind Energy Project

Chokecherry And Sierra Madre Wind Energy Project is a 3.55 GW wind farm located in Wyoming, United States. The facility is currently under construction, with a targeted start date of 2029.

3.55 GWCapacity (all phases)
ConstructionStatus
2029Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 5 units or phases at this site (under construction 3.55 GW).

Technology: Onshore.

Ownership: Power Company of Wyoming LLC.

4 further units or phases are scheduled to come online in 2029–2031.

Why it matters

  • The largest wind farm in United States by capacity, out of 1333 operating, under-construction and planned wind facilities tracked in the country.
  • If completed, it would add 3.55 GW to United States's wind fleet — equivalent to 2.2% of today's operating wind capacity.
  • Ranks #67 worldwide among wind facilities of the same status group by capacity.

Wind output varies with weather, so large wind farms depend on transmission capacity and system flexibility to deliver their power to demand centres.

Wind power in United States

United States has 158.6 GW of operating wind capacity across 1,182 plants in the Global Energy Monitor dataset — 12% of the country's total operating power capacity of 1,280.9 GW.

The wind pipeline in United States includes 15.7 GW under construction and 70.3 GW at earlier planning stages.

Other major wind plants in United States include Coastal Virginia Offshore Wind (CVOW) Commercial Project (2.64 GW), SunZia Wind (2.56 GW) and Alta Wind Energy Center (1.10 GW).

See the full list: Wind farms in United States →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
1A 844 MW Construction Onshore 2029
1B 850 MW Construction Onshore 2029
1C 500 MW Cancelled Onshore
2A 1.30 GW Construction Onshore 2030
2B 554 MW Construction Onshore 2031

How wind farms work

A wind farm is a group of wind turbines whose rotors turn a generator, either directly or through a gearbox. Modern onshore turbines are typically rated at 3–7 MW each and offshore turbines at 8–15 MW; power is collected through an internal cable network and fed into the grid at a substation.

Output rises steeply with wind speed, so location matters more than for almost any other technology. Onshore wind farms usually reach capacity factors of 25–40% and offshore farms 40–50%. Because generation is variable, wind relies on strong transmission links, storage and flexible plants to balance supply and demand.

Technology at Chokecherry And Sierra Madre Wind Energy Project

This is an onshore wind farm, built on land.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Chokecherry And Sierra Madre Wind Energy Project is located in Wyoming, United States, at approximately 41.6831, -107.2001. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Chokecherry And Sierra Madre Wind Energy Project is owned by Power Company of Wyoming LLC.

Frequently asked questions

What is the capacity of Chokecherry And Sierra Madre Wind Energy Project?

Chokecherry And Sierra Madre Wind Energy Project has a capacity of 3.55 GW according to the latest Global Energy Monitor data. This figure covers the 5 units or phases listed for the site.

What type of facility is Chokecherry And Sierra Madre Wind Energy Project?

Chokecherry And Sierra Madre Wind Energy Project is a wind farm. This is an onshore wind farm, built on land.

Who owns Chokecherry And Sierra Madre Wind Energy Project?

Chokecherry And Sierra Madre Wind Energy Project is owned by Power Company of Wyoming LLC.

Where is Chokecherry And Sierra Madre Wind Energy Project located?

It is located in Wyoming, United States. Approximate coordinates: 41.6831, -107.2001.

Is Chokecherry And Sierra Madre Wind Energy Project operational?

According to the latest data, Chokecherry And Sierra Madre Wind Energy Project is under construction. Under construction means physical work has started on site but the facility is not yet in commercial service.

When is Chokecherry And Sierra Madre Wind Energy Project expected to start?

Start year: 2029. Current status: Construction. 4 further units or phases are scheduled to come online in 2029–2031.

How big is Chokecherry And Sierra Madre Wind Energy Project compared with other facilities in United States?

Chokecherry And Sierra Madre Wind Energy Project ranks #1 by capacity among 1333 comparable wind facilities tracked in United States.

Nearby energy infrastructure

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects