CCC Riviera Maya (Valladolid) power station

CCC Riviera Maya (Valladolid) power station is a 1.13 GW oil- and gas-fired power station located in Yucatán, Mexico. The facility is currently under construction, with a targeted start date of 2027.

1.13 GWCapacity (all phases)
ConstructionStatus
2027Start year
View on the interactive map →

Overview

Technology: combined cycle; fuel: natural gas, fossil liquids: diesel.

Ownership: Comisión Federal de Electricidad EPE.

Why it matters

  • The 10th-largest oil- and gas-fired power station in Mexico by capacity (of 125 operating, under-construction and planned oil & gas facilities tracked).
  • If completed, it would add 1.13 GW to Mexico's oil & gas fleet — equivalent to 2.1% of today's operating oil & gas capacity.

Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.

Oil & gas power in Mexico

Mexico has 55.0 GW of operating oil & gas capacity across 112 plants in the Global Energy Monitor dataset — 56% of the country's total operating power capacity of 98.0 GW.

The oil & gas pipeline in Mexico includes 5.30 GW under construction and 3.80 GW at earlier planning stages.

Other major oil & gas plants in Mexico include Manzanillo (Manuel Álvarez Moreno) power station (3.10 GW), Adolfo López Mateos power station (2.10 GW) and Jorge Luque power station (1.66 GW).

See the full list: Gas & oil power plants in Mexico →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
1 1.13 GW Construction combined cycle 2027

How gas & oil power plants work

Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.

Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.

Technology at CCC Riviera Maya (Valladolid) power station

Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.

Location

Location is approximate. Imagery © Esri, Maxar, Earthstar Geographics

CCC Riviera Maya (Valladolid) power station is located in Yucatán, Mexico, at approximately 20.6979, -88.2698. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

CCC Riviera Maya (Valladolid) power station is owned by Comisión Federal de Electricidad EPE. Across the dataset, Comisión Federal de Electricidad EPE is linked to 95 power plants with 43.7 GW of operating capacity.

Frequently asked questions

What is the capacity of CCC Riviera Maya (Valladolid) power station?

CCC Riviera Maya (Valladolid) power station has a capacity of 1.13 GW according to the latest Global Energy Monitor data.

What type of facility is CCC Riviera Maya (Valladolid) power station?

CCC Riviera Maya (Valladolid) power station is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.

Who owns CCC Riviera Maya (Valladolid) power station?

CCC Riviera Maya (Valladolid) power station is owned by Comisión Federal de Electricidad EPE.

Where is CCC Riviera Maya (Valladolid) power station located?

It is located in Yucatán, Mexico. Approximate coordinates: 20.6979, -88.2698.

Is CCC Riviera Maya (Valladolid) power station operational?

According to the latest data, CCC Riviera Maya (Valladolid) power station is under construction. Under construction means physical work has started on site but the facility is not yet in commercial service.

When is CCC Riviera Maya (Valladolid) power station expected to start?

Start year: 2027. Current status: Construction.

How big is CCC Riviera Maya (Valladolid) power station compared with other facilities in Mexico?

CCC Riviera Maya (Valladolid) power station ranks #10 by capacity among 125 comparable oil & gas facilities tracked in Mexico.

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.