Hydropower · Mexico

Manuel Moreno Torres hydroelectric plant

Manuel Moreno Torres hydroelectric plant is a 2.40 GW hydropower plant located in Chiapas, Mexico. The facility is currently in operation, with its first unit entering service in 1981.

2.40 GWCapacity
OperatingStatus
1981Start year
View on the interactive map →

Overview

Technology: conventional storage.

Ownership: Comisión Federal de Electricidad EPE.

Why it matters

  • The largest hydropower plant in Mexico by capacity, out of 36 operating hydropower facilities tracked in the country.
  • Provides about 20% of Mexico's operating hydropower capacity and roughly 2.4% of all operating power capacity in the country in the dataset.
  • Ranks #54 worldwide among hydropower facilities of the same status group by capacity.
  • At a typical capacity factor of 40% for this technology, it would generate roughly 8.4 TWh of electricity a year (indicative estimate).

Hydropower provides renewable electricity and, where reservoirs exist, dispatchable output and storage that help stabilise the grid; output varies with rainfall and river flows.

Hydropower power in Mexico

Mexico has 12.2 GW of operating hydropower capacity across 36 plants in the Global Energy Monitor dataset — 12% of the country's total operating power capacity of 98.0 GW.

The hydropower pipeline in Mexico includes 300 MW under construction and 90 MW at earlier planning stages.

Other major hydropower plants in Mexico include El Infiernillo hydroelectric plant (1.20 GW) and Malpaso hydroelectric plant (Mexico) (1.08 GW).

See the full list: Hydropower plants in Mexico →

How hydropower plants work

Hydropower plants convert the energy of falling or flowing water into electricity: water passes through turbines placed at the foot of a dam or along a diversion channel, and the turbines drive generators. Output depends on the height of the water drop (the head) and the volume of water flowing.

Reservoir and pumped-storage schemes can store energy and release it within minutes, which makes hydropower one of the most flexible sources on the grid. Annual generation varies with rainfall and snowmelt, and large dams can have significant effects on river ecosystems and downstream water use.

Technology at Manuel Moreno Torres hydroelectric plant

Its reservoir allows water to be stored and power to be dispatched when it is most needed.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Manuel Moreno Torres hydroelectric plant is located in Chiapas, Mexico, at approximately 16.9428, -93.1011. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Manuel Moreno Torres hydroelectric plant is owned by Comisión Federal de Electricidad EPE. Across the dataset, Comisión Federal de Electricidad EPE is linked to 95 power plants with 43.7 GW of operating capacity.

Frequently asked questions

What is the capacity of Manuel Moreno Torres hydroelectric plant?

Manuel Moreno Torres hydroelectric plant has a capacity of 2.40 GW according to the latest Global Energy Monitor data.

What type of facility is Manuel Moreno Torres hydroelectric plant?

Manuel Moreno Torres hydroelectric plant is a hydropower plant. Its reservoir allows water to be stored and power to be dispatched when it is most needed.

Who owns Manuel Moreno Torres hydroelectric plant?

Manuel Moreno Torres hydroelectric plant is owned by Comisión Federal de Electricidad EPE.

Where is Manuel Moreno Torres hydroelectric plant located?

It is located in Chiapas, Mexico. Approximate coordinates: 16.9428, -93.1011.

Is Manuel Moreno Torres hydroelectric plant operational?

According to the latest data, Manuel Moreno Torres hydroelectric plant is in operation. Operating means the facility is built and in commercial service.

When did Manuel Moreno Torres hydroelectric plant start operating?

Start year: 1981. Current status: Operating.

How much electricity does Manuel Moreno Torres hydroelectric plant generate?

Actual output data are not published for every plant. As an indicative estimate, Manuel Moreno Torres hydroelectric plant would produce about 8.4 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.

How big is Manuel Moreno Torres hydroelectric plant compared with other facilities in Mexico?

Manuel Moreno Torres hydroelectric plant ranks #1 by capacity among 36 comparable hydropower facilities tracked in Mexico.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects