Benghazi Simple Cycle Power Plant

Benghazi Simple Cycle Power Plant is a 1.36 GW oil- and gas-fired power station located in Benghazi, Libya. The facility is currently under construction, with a targeted start date of 2030.

1.36 GWCapacity (all phases)
ConstructionStatus
2030Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 4 units or phases at this site (under construction 1.36 GW).

Technology: gas turbine; fuel: natural gas, fossil liquids: unknown.

Ownership: General Electricity Company of Libya.

4 further units or phases are scheduled to come online in 2030.

Why it matters

  • The 5th-largest oil- and gas-fired power station in Libya by capacity (of 27 operating, under-construction and planned oil & gas facilities tracked).
  • If completed, it would add 1.36 GW to Libya's oil & gas fleet — equivalent to 9.2% of today's operating oil & gas capacity.

Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.

Oil & gas power in Libya

Libya has 14.8 GW of operating oil & gas capacity across 23 plants in the Global Energy Monitor dataset — 97% of the country's total operating power capacity of 15.3 GW.

The oil & gas pipeline in Libya includes 3.72 GW under construction and 1.00 GW at earlier planning stages.

Other major oil & gas plants in Libya include North Benghazi power station (1.74 GW), Al Khums power station (1.61 GW) and Al Zawiya power station (1.54 GW).

See the full list: Gas & oil power plants in Libya →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
1 340 MW Construction gas turbine 2030
2 340 MW Construction gas turbine 2030
3 340 MW Construction gas turbine 2030
4 340 MW Construction gas turbine 2030

How gas & oil power plants work

Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.

Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.

Technology at Benghazi Simple Cycle Power Plant

Open-cycle gas turbines can start within minutes and are mainly used as peaking plants, at efficiencies of roughly 30–40%.

Location

Location is approximate. Imagery © Esri, Maxar, Earthstar Geographics

Benghazi Simple Cycle Power Plant is located in Benghazi, Libya, at approximately 32.2069, 20.1530. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Benghazi Simple Cycle Power Plant is owned by General Electricity Company of Libya. Across the dataset, General Electricity Company of Libya is linked to 29 power plants with 14.8 GW of operating capacity.

Frequently asked questions

What is the capacity of Benghazi Simple Cycle Power Plant?

Benghazi Simple Cycle Power Plant has a capacity of 1.36 GW according to the latest Global Energy Monitor data. This figure covers the 4 units or phases listed for the site.

What type of facility is Benghazi Simple Cycle Power Plant?

Benghazi Simple Cycle Power Plant is a oil- and gas-fired power station. Open-cycle gas turbines can start within minutes and are mainly used as peaking plants, at efficiencies of roughly 30–40%.

Who owns Benghazi Simple Cycle Power Plant?

Benghazi Simple Cycle Power Plant is owned by General Electricity Company of Libya.

Where is Benghazi Simple Cycle Power Plant located?

It is located in Benghazi, Libya. Approximate coordinates: 32.2069, 20.1530.

Is Benghazi Simple Cycle Power Plant operational?

According to the latest data, Benghazi Simple Cycle Power Plant is under construction. Under construction means physical work has started on site but the facility is not yet in commercial service.

When is Benghazi Simple Cycle Power Plant expected to start?

Start year: 2030. Current status: Construction. 4 further units or phases are scheduled to come online in 2030.

How big is Benghazi Simple Cycle Power Plant compared with other facilities in Libya?

Benghazi Simple Cycle Power Plant ranks #5 by capacity among 27 comparable oil & gas facilities tracked in Libya.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.