Overview
Global Energy Monitor tracks 3 units or phases at this site (operating 1.00 GW, under construction 500 MW).
Technology: internal combustion; fuel: natural gas.
Ownership: Arctic LNG 2 LLC (parent company: Novatek PJSC; China National Petroleum Corp; CNOOC Ltd; TotalEnergies SE; Japan Organization for Metals and Energy Security; Mitsui & Co Ltd).
1 further units or phases are scheduled to come online in 2028.
Why it matters
- At a typical capacity factor of 40% for this technology, it would generate roughly 3.5 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Russia
Russia has 117.8 GW of operating oil & gas capacity across 226 plants in the Global Energy Monitor dataset — 49% of the country's total operating power capacity of 240.2 GW.
The oil & gas pipeline in Russia includes 3.35 GW under construction and 1.52 GW at earlier planning stages.
Other major oil & gas plants in Russia include Surgut GRES-2 power station (5.74 GW), Kostromskaya GRES power station (3.75 GW) and Perm GRES power station (3.39 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Phase 1 | 500 MW | internal combustion | 2025 | ||
| Phase 2 (Beregovaya GTES) | 500 MW | Construction | internal combustion | 2028 | |
| Phase 3 | 500 MW | internal combustion | 2025 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Arctic LNG 2 Terminal power station
Reciprocating engine units are modular and flexible, and are common on islands, in remote grids and for backup supply.
Location
Arctic LNG 2 Terminal power station is located in Yamal-Nenets, Russia, at approximately 70.9952, 73.8295. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Arctic LNG 2 Terminal power station is owned by Arctic LNG 2 LLC. The ultimate parent company is Novatek PJSC; China National Petroleum Corp; CNOOC Ltd; TotalEnergies SE; Japan Organization for Metals and Energy Security; Mitsui & Co Ltd. Across the dataset, Novatek PJSC is linked to 2 power plants with 1.00 GW of operating capacity.
Frequently asked questions
What is the capacity of Arctic LNG 2 Terminal power station?
Arctic LNG 2 Terminal power station has a capacity of 1.00 GW according to the latest Global Energy Monitor data. This figure covers the 3 units or phases listed for the site.
What type of facility is Arctic LNG 2 Terminal power station?
Arctic LNG 2 Terminal power station is a oil- and gas-fired power station. Reciprocating engine units are modular and flexible, and are common on islands, in remote grids and for backup supply.
Who owns Arctic LNG 2 Terminal power station?
Arctic LNG 2 Terminal power station is owned by Arctic LNG 2 LLC. The ultimate parent company is Novatek PJSC; China National Petroleum Corp; CNOOC Ltd; TotalEnergies SE; Japan Organization for Metals and Energy Security; Mitsui & Co Ltd.
Where is Arctic LNG 2 Terminal power station located?
It is located in Yamal-Nenets, Russia. Approximate coordinates: 70.9952, 73.8295.
Is Arctic LNG 2 Terminal power station operational?
According to the latest data, Arctic LNG 2 Terminal power station is in operation. Operating means the facility is built and in commercial service.
When did Arctic LNG 2 Terminal power station start operating?
Start year: 2025. Current status: Operating. 1 further units or phases are scheduled to come online in 2028.
How much electricity does Arctic LNG 2 Terminal power station generate?
Actual output data are not published for every plant. As an indicative estimate, Arctic LNG 2 Terminal power station would produce about 3.5 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Arctic LNG 2 Terminal power station compared with other facilities in Russia?
Arctic LNG 2 Terminal power station ranks #30 by capacity among 226 comparable oil & gas facilities tracked in Russia.