Overview
The tracker lists 3 trains, units or expansion phases at the terminal.
Capacity is expressed in million tonnes per annum (mtpa) of liquefied natural gas output.
One mtpa of LNG corresponds to roughly 1.36 billion cubic metres of natural gas per year, so this capacity equals about 13.5 bcm/y of gas.
Ownership: Woodside Burrup Train 2 A Pty Ltd; Global Infrastructure Partners (parent company: Woodside Energy Group Ltd; BlackRock Inc).
Why it matters
- The 3rd-largest LNG export (liquefaction) terminal in Australia by capacity (of 9 operating lng export terminal facilities tracked).
- Ranks #24 worldwide among lng export terminal facilities of the same status group by capacity.
Export terminals liquefy natural gas for shipment by tanker, connecting gas reserves to global markets.
LNG terminals in Australia
The dataset tracks 18 lng terminals in Australia, including operating, planned and shelved projects.
Australia has 86.8 mtpa of operating LNG export capacity across 9 terminals.
Trains and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| T2 | 5.00 mtpa | Construction | |||
| T1 | 4.90 mtpa | 2012 | |||
| T3 | 4.30 mtpa | Cancelled |
How lng terminals work
An LNG export terminal cools natural gas to about −162 °C, shrinking its volume around 600 times so it can be shipped by specialised tankers. Liquefaction capacity is organised in "trains", each a self-contained processing line.
Export projects are among the largest energy investments in the world and are usually underpinned by long-term sales contracts. The leading exporters are the United States, Qatar and Australia.
Location
Pluto LNG Terminal is located in Western Australia, Australia, at approximately -20.6128, 116.7656. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Pluto LNG Terminal is owned by Woodside Burrup Train 2 A Pty Ltd; Global Infrastructure Partners. The ultimate parent company is Woodside Energy Group Ltd; BlackRock Inc. Across the dataset, Woodside Energy Group Ltd is linked to 6 lng terminals.
Frequently asked questions
What is the capacity of Pluto LNG Terminal?
Pluto LNG Terminal has a capacity of 9.90 mtpa according to the latest Global Energy Monitor data. This figure covers the 3 units or phases listed for the site.
What type of facility is Pluto LNG Terminal?
Pluto LNG Terminal is a LNG export (liquefaction) terminal.
Who owns Pluto LNG Terminal?
Pluto LNG Terminal is owned by Woodside Burrup Train 2 A Pty Ltd; Global Infrastructure Partners. The ultimate parent company is Woodside Energy Group Ltd; BlackRock Inc.
Where is Pluto LNG Terminal located?
It is located in Western Australia, Australia. Approximate coordinates: -20.6128, 116.7656.
Is Pluto LNG Terminal operational?
According to the latest data, Pluto LNG Terminal is in operation. Operating means the facility is built and in commercial service.
When did Pluto LNG Terminal start operating?
Start year: 2012. Current status: Operating.
How big is Pluto LNG Terminal compared with other facilities in Australia?
Pluto LNG Terminal ranks #3 by capacity among 9 comparable lng export terminal facilities tracked in Australia.