Wind farms in Spain (page 7)

This list ranks all 1,710 wind farms tracked in Spain by capacity, including operating, under-construction, planned, shelved and retired projects. 860 of them are operating, with a combined capacity of 31.0 GW.

Open the interactive map →
#NameTypeCapacityStatusStart
301Orichi wind farmAragónWind53 MWPre-construction
302Paris wind farmAragónWind53 MWPre-construction
303Quimera wind farmAragónWind53 MWPre-construction
304Tornado wind farm (Spain)GaliciaWind53 MWPre-construction
305Chiquera wind farmAndalucíaWind53 MWPre-construction
306Benalaz wind farmComunidad ValencianaWind52 MWOperating2011
307Corral del Molino wind farmComunidad Foral de NavarraWind52 MWOperating2024
308El Águila wind farmAragónWind52 MWOperating2001
309La Herrada wind farmWind52 MWConstruction
310Valderrete wind farmLa RiojaWind52 MWPre-construction
311Chorreaderos wind farmAndalucíaWind51 MWOperating
312Garma Blanca wind farmCantabriaWind51 MWShelved
313La Coteruca wind farmCantabriaWind51 MWPre-construction
314Motilla wind farmCastilla-La ManchaWind51 MWOperating2021
315Peña Blanca wind farmComunidad Foral de NavarraWind51 MWOperating1999
316Ribota wind farmCantabriaWind51 MWShelved
317Coll de Traginers wind farmCataluñaWind50 MWShelved
318Colladetes wind farmCataluñaWind50 MWPre-construction
319Estacas de Trueba wind farmCastilla y LeónWind50 MWPre-construction
320Merindades wind farmCastilla y LeónWind50 MWPre-construction
321Piruquito wind farmCantabriaWind50 MWPre-construction
322Serra de Liñares wind farmGalicia, AusturiasWind50 MWPre-construction
323Orzar wind farmGaliciaWind50 MWPre-construction
324A Rua (Avintia) wind farmWind50 MWAnnounced
325Agualobos wind farmAragónWind50 MWPre-construction
326Aiko wind farmComunidad Foral de NavarraWind50 MWPre-construction
327Alisio (ACS) wind farmCanariasWind50 MWShelved
328Alto De La Degollada wind farmCastilla y LeónWind50 MWOperating2010
329Ameixeiras-Testeiros wind farmGaliciaWind50 MWOperating2002
330Andella wind farmCastilla y LeónWind50 MWOperating2024
331Antlia wind farmCataluñaWind50 MWShelved
332Arbequina wind farmAragónWind50 MWPre-construction
333Arrecife wind farmCanariasWind50 MWOperating2021
334Artzentales-Sopuerta wind farmPaís VascoWind50 MWPre-construction
335Atalaya wind farmAragónWind50 MWOperating2002
336Atreo wind farmComunidad Foral de NavarraWind50 MWPre-construction
337Avellanosa wind farmCastilla y LeónWind50 MWPre-construction
338Badaia wind farmWind50 MWOperating2005
339Barranco de Mairaga wind farmComunidad Foral de NavarraWind50 MWShelved
340Belchite wind farmAragónWind50 MWOperating2004
341Berdeak wind farmPaís VascoWind50 MWPre-construction
342Berg I wind farmCastilla y LeónWind50 MWPre-construction2028
343Boquerón (EDPR) wind farmAragónWind50 MWOperating2001
344Buseco wind farmAsturiasWind50 MWOperating2022
345Cabanillas wind farmComunidad Foral de NavarraWind50 MWOperating2020
346Cabazuelas wind farmWind50 MWShelved
347Cabeza Morena Dueñas wind farmCastilla-La ManchaWind50 MWOperating2008
348Cabigordo wind farmAragónWind50 MWPre-construction
349Cabildo wind farmCanariasWind50 MWPre-construction2028
350Cabimonteros wind farmLa RiojaWind50 MWOperating2001

Special projects