Wind farms in Spain (page 2)

This list ranks all 1,710 wind farms tracked in Spain by capacity, including operating, under-construction, planned, shelved and retired projects. 860 of them are operating, with a combined capacity of 31.0 GW.

Open the interactive map →
#NameTypeCapacityStatusStart
51CTCC Escatrón wind farmAragónWind282 MWPre-construction
52Muno wind farmAragónWind273 MWPre-construction
53El Hito wind farmExtremaduraWind265 MWPre-construction
54Campillo De Altobuey wind farmWind259 MWOperating2022
55Maresia Offshore wind farmWind255 MWPre-construction2026
56Aguayo wind farmCantabriaWind250 MWShelved
57Villaobispo Wind ComplexCastilla y LeónWind240 MWShelved
58San Borondón wind farmCanariasWind238 MWPre-construction
59Yel wind farmCanariasWind225 MWShelved
60Floating Offshore Wind Canarias wind farmCanariasWind210 MWShelved
61Caja Rural De Soria wind farmCastilla y LeónWind207 MWPre-construction
62Monlora wind farmAragónWind202 MWOperating
63La Vacada wind farmAragónWind201 MWPre-construction
64Bonastre wind farmAragónWind199 MWPre-construction
65Tivissa (Desarrollos Eólicos Tivissa) wind farmCataluñaWind198 MWPre-construction
66Céfiro (Green Capital) wind farmAragónWind192 MWShelved
67Arlanza 3 wind farmCastilla y LeónWind190 MWAnnounced2027
68Arlanza 4 wind farmCastilla y LeónWind190 MWAnnounced
69El Cid wind farmAragónWind186 MWPre-construction
70San Ciprián Smelter wind farmWind183 MWAnnounced
71Canarray wind farmCanariasWind180 MWPre-construction2029
72La Serena wind farmExtremaduraWind180 MWPre-construction
73Tico wind farmAragónWind180 MWOperating2022
74Lécera wind farmAragónWind180 MWPre-construction
75Parque Navarra wind farmComunidad Foral de NavarraWind176 MWShelved
76Prada wind farmGaliciaWind168 MWPre-construction
77Tordesillas wind farmCastilla y LeónWind163 MWShelved
78Torre Miró wind farmComunidad ValencianaWind162 MWOperating2006
79Santuario wind farmGaliciaWind161 MWPre-construction2027
80La Estrella wind farm (Spain)AragónWind159 MWPre-construction
81Corpal wind farmCastilla y LeónWind156 MWPre-construction
82Cabecero wind farmAragónWind156 MWPre-construction
83Rebordechao wind farmGaliciaWind154 MWShelved
84Filabres wind farmAndalucíaWind153 MWPre-construction
85El Escudo wind farmCantabriaWind151 MWConstruction2026
86Torozos wind farmCastile and LeónWind150 MWOperating2019
87El Casarejo wind farmCastilla-La ManchaWind150 MWAnnounced
88Mency Floating Offshore wind farmWind150 MWPre-construction
89San Lorenzo wind farm (Spain)Castile and LeónWind150 MWOperating2007
90Segarra Sur wind farmCataluñaWind149 MWShelved
91Contrebia wind farmAragónWind148 MWPre-construction
92Henar wind farmAragónWind147 MWPre-construction
93Alto Cabrera wind farmCastilla y LeónWind144 MWShelved
94Gran Canaria Este Floating wind farmWind144 MWShelved
95Lardeiras wind farmWind144 MWPre-construction
96Ocean Winds Floating (Ocean Winds/Disa) wind farmCanariasWind144 MWShelved
97Pegaso wind farmAragónWind144 MWShelved
98Conca de Barberà wind farmCataluñaWind140 MWPre-construction
99Muñó wind farmCastilla y LeónWind140 MWPre-construction
100Proyecto Híbrido Villamayor wind farmCastilla y LeónWind139 MWShelved

Special projects