Global Energy Monitor tracks 501 energy facilities in Nigeria, including power plants with 14.4 GW of operating generating capacity. A further 4.37 GW is under construction and 22.1 GW is in planning stages.
Nigeria has 14.4 GW of operating power generation capacity across 64 plants in the Global Energy Monitor dataset. Oil & gas is the largest source, with 11.0 GW or 77% of the total. It is followed by hydropower (20%) and coal (2.4%).
Low-carbon sources — nuclear, hydropower, wind, solar, geothermal and bioenergy — make up 21% of operating capacity, while coal, oil and gas account for 79%. Wind and solar alone represent 1.1%.
A further 4.37 GW of generating capacity is under construction, led by hydropower (2.58 GW). Another 22.1 GW is announced, proposed or in pre-construction.
Beyond power generation, the map covers 25 gas pipeline projects (about 3,691 km in operation), 26 oil and NGL pipelines, 8 LNG terminals (29.8 mtpa export capacity in operation), 265 oil and gas fields (204 producing) and 13 coal mines in Nigeria.
How much power generation capacity does Nigeria have?
Global Energy Monitor tracks 14.4 GW of operating power plant capacity in Nigeria, counting plants of all technologies above the trackers' size thresholds.
What is the largest power plant in Nigeria?
The largest power plant in Nigeria in the dataset is Makurdi hydroelectric plant, a 1.65 GW hydropower plant.
What share of Nigeria's power capacity is renewable?
Renewables — hydropower, wind, solar, geothermal and bioenergy — make up about 21% of operating power capacity in Nigeria. Note that shares of capacity differ from shares of electricity generated, because technologies run for different numbers of hours.
Does Nigeria have nuclear power plants?
No operating nuclear power plant is recorded in Nigeria in the dataset.
Does Nigeria have LNG terminals?
Yes. The dataset lists 8 LNG terminal projects in Nigeria. Operating export capacity: 29.8 mtpa.