Wind farms in Japan (page 4)

This list ranks all 292 wind farms tracked in Japan by capacity, including operating, under-construction, planned, shelved and retired projects. 172 of them are operating, with a combined capacity of 5.38 GW.

Open the interactive map →
#NameTypeCapacityStatusStart
151Suzu Otani Pass wind farmWind36 MWPre-construction
152Suzu Oya Pass wind farmWind36 MWShelved
153Jusanko wind farmWind35 MWOperating2019
154Kamikatsu-Kamiyama wind farmWind35 MWOperating2022
155Date Golden wind farmWind34 MWOperating2017
156Irozaki wind farmWind34 MWOperating2010
157Minami Ehime No.2 wind farmWind34 MWConstruction
158Sandai Myojin wind farmWind34 MWOperating2024
159Shichinohe Towada wind farmWind34 MWOperating2021
160Tomamae Winvilla wind farmWind34 MWOperating2023
161Ohorayama wind farmWind33 MWOperating2018
162Zenibako wind farmWind33 MWOperating2020
163Iwaya (Eurus) wind farmWind33 MWConstruction2001
164Fukami Town wind farmWind32 MWPre-construction
165Aduchiohshima wind farmWind32 MWOperating2007
166Azumakogen wind farmWind32 MWOperating2023
167Mutsu Ogawara wind farmWind32 MWOperating2003
168Yokohama Town Hibaritaira wind farmWind32 MWOperating2018
169Shichinohe-Towada wind farmWind31 MWOperating2021
170Fukushima Demo floating wind farmWind30 MWPre-construction2027
171Kamis Offshore wind farmWind30 MWOperating2010
172Kimotsuki wind farmWind30 MWOperating2011
173Minami Town floating offshore wind farmWind30 MWAnnounced
174Nishime wind farmWind30 MWConstruction2023
175Rokkasho-Mura wind farmWind30 MWOperating2003
176Sarakitomani wind farmWind30 MWOperating2001
177Suzu 2 wind farmWind30 MWOperating2008
178Tempoku wind farmWind30 MWOperating2018
179Tomioka Town offshore wind farmFukushimaWind30 MWPre-construction2027
180Toyotomi wind farmWind30 MWOperating2024
181Chitose wind farmWind29 MWOperating2022
182Nakakyushu Onitayama wind farmWind29 MWOperating2016
183Oga Wind PowerWind29 MWOperating2015
184Shiga wind farmWind29 MWShelved
185Hachiryu wind farmWind28 MWOperating2006
186Hiyama-Kogen wind farmWind28 MWOperating2011
187Kaminokuni wind farmWind28 MWOperating2014
188Minami Ehime wind farmWind28 MWOperating2015
189Sakata North Port (Nearshore) Offshore wind farmWind28 MWPre-construction2014
190Yanagiyama wind farmWind28 MWOperating2014
191Tokoro Notori wind farmWind27 MWOperating2024
192Iwaya (Cosmo) wind farmWind27 MWOperating2003
193Karatsu-Chinzei wind farmWind27 MWOperating2021
194Shiribetsu wind farmWind27 MWOperating2022
195Inami wind farmWind26 MWOperating2018
196Minami Oosumi wind farmWind26 MWOperating2003
197Toyota Tahara wind farmWind26 MWShelved
198Nikaho-Kogen wind farmWind25 MWOperating2024
199Takamori wind farmWind25 MWOperating2018
200Toyoku wind farmWind25 MWOperating2007

Special projects