Gas pipelines in Hungary

This list ranks all 15 gas pipelines tracked in Hungary by capacity, including operating, under-construction, planned, shelved and retired projects. 9 of them are operating, with a combined capacity of 11.5 bcm/y.

Open the interactive map →
#NameTypeCapacityStatusStart
1Eastring PipelineGas pipeline20.0 bcm/yProposed2027
2Városföld-Slobodnica Gas PipelineSouthern Great PlainsGas pipeline7.00 bcm/yOperating2011
3Serbian-Hungarian Gas PipelineGas pipeline6.00 bcm/yOperating2021
4Arad-Szeged Gas PipelineGas pipeline4.50 bcm/yOperating2010
5Slovakia-Hungary Interconnector Gas PipelineGas pipeline4.50 bcm/yOperating2015
6Hungary-Austria Interconnector Gas PipelineGas pipeline4.26 bcm/yOperating1996
7Beregdaroc–Hajduszoboszlo Gas PipelineGas pipelineOperating
8Beregdaroc–Nemesbikk Gas PipelineGas pipelineOperating
9Donje Mijolac-Bata Gas PipelineGas pipelineOperating
10Hajduszoboszlo–Nemesbikk Gas PipelineGas pipelineOperating
11Hajduszoboszlo–Varosfoeld Gas PipelineGas pipelineOperating
12Nemesbikk–Budapest Gas PipelineGas pipelineOperating
13Ozdany–Nemesbikk Gas PipelineGas pipelineOperating
14Varosfoeld–Bata Gas PipelineGas pipelineOperating
15Vecsés-Városföld transit lineVárosföldGas pipelineProposed2022

Special projects