Guyana energy infrastructure
Global Energy Monitor tracks 40 energy facilities in Guyana, including power plants with 78 MW of operating generating capacity. A further 608 MW is under construction and 560 MW is in planning stages.
Guyana's energy system at a glance
Guyana has 78 MW of operating power generation capacity across 4 plants in the Global Energy Monitor dataset. Oil & gas is the largest source, with 72 MW or 93% of the total.
Low-carbon sources — nuclear, hydropower, wind, solar, geothermal and bioenergy — make up 7.1% of operating capacity, while coal, oil and gas account for 93%. Wind and solar alone represent 7.1%.
A further 608 MW of generating capacity is under construction, led by oil & gas (600 MW). Another 560 MW is announced, proposed or in pre-construction.
Beyond power generation, the map covers 1 gas pipeline projects, 1 LNG terminals and 23 oil and gas fields (4 producing) in Guyana.
Operating power capacity by technology
- Oil & gas 72 MW 93%
- Solar 5.5 MW 7.1%
| Technology | Operating | Plants operating | Under construction | Planned |
|---|---|---|---|---|
| Oil & gas | 72 MW | 1 | 600 MW | 300 MW |
| Solar | 5.5 MW | 3 | 8.0 MW | 45 MW |
| Hydropower | — | 0 | — | 165 MW |
| Wind | — | 0 | — | 50 MW |
Largest power plants in Guyana
| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Wales power stationEssequibo Islands-West Demerara | Oil & gas | 600 MW | Construction | 2027 |
| 2 | Berbice power stationEast Berbice-Corentyne | Oil & gas | 300 MW | Announced | 2030 |
| 3 | Amaila Falls hydroelectric plantPotaro-Siparuni | Hydropower | 165 MW | Pre-construction | 2029 |
| 4 | Powership Ela Sultan (Guyana) power stationEssequibo Islands-West Demerara | Oil & gas | 72 MW | 2024 | |
| 5 | Hope wind farmDemerara-Mahaica | Wind | 50 MW | Pre-construction | |
| 6 | Hope solar farmDemerara-Mahaica | Solar | 20 MW | Shelved | |
| 7 | Aurora gold mine solar farm | Solar | 16 MW | Announced | |
| 8 | Linden solar farmUpper Demerara-Berbice | Solar | 15 MW | Pre-construction | 2026 |
| 9 | Berbice solar farmUpper Demerara-Berbice | Solar | 10 MW | Pre-construction | |
| 10 | Essequibo solar farmPotaro-Siparuni | Solar | 8.0 MW | Construction |
Pipeline: capacity under construction
- Oil & gas 600 MW 99%
- Solar 8.0 MW 1.3%
Gas & oil power plants in Guyana
See all 3 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Wales power stationEssequibo Islands-West Demerara | Oil & gas | 600 MW | Construction | 2027 |
| 2 | Berbice power stationEast Berbice-Corentyne | Oil & gas | 300 MW | Announced | 2030 |
| 3 | Powership Ela Sultan (Guyana) power stationEssequibo Islands-West Demerara | Oil & gas | 72 MW | 2024 |
Hydropower plants in Guyana
See all 1 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Amaila Falls hydroelectric plantPotaro-Siparuni | Hydropower | 165 MW | Pre-construction | 2029 |
Wind farms in Guyana
See all 1 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Hope wind farmDemerara-Mahaica | Wind | 50 MW | Pre-construction |
Solar farms in Guyana
See all 10 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Hope solar farmDemerara-Mahaica | Solar | 20 MW | Shelved | |
| 2 | Aurora gold mine solar farm | Solar | 16 MW | Announced | |
| 3 | Linden solar farmUpper Demerara-Berbice | Solar | 15 MW | Pre-construction | 2026 |
| 4 | Berbice solar farmUpper Demerara-Berbice | Solar | 10 MW | Pre-construction | |
| 5 | Essequibo solar farmPotaro-Siparuni | Solar | 8.0 MW | Construction |
Gas pipelines in Guyana
See all 1 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Liza Gas Pipeline | Gas pipeline | 1.28 bcm/y | Construction | 2025 |
LNG terminals in Guyana
See all 1 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Guyana LNG Terminal | LNG export terminal | Proposed |
Oil & gas fields in Guyana
See all 23 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Liza Deep Oil and Gas Field (Guyana) | Oil & gas field | 80.3 million boe/y | 2022 | |
| 2 | Liza Oil and Gas Field (Guyana) | Oil & gas field | 48.9 million boe/y | 2019 | |
| 3 | Barreleye Oil and Gas Field (Guyana) | Oil & gas field | Discovered | ||
| 4 | Bluefin Oil and Gas Field (Guyana) | Oil & gas field | Discovered | ||
| 5 | Fangtooth Oil and Gas Field (Guyana) | Oil & gas field | Discovered |
Frequently asked questions
How much power generation capacity does Guyana have?
Global Energy Monitor tracks 78 MW of operating power plant capacity in Guyana, counting plants of all technologies above the trackers' size thresholds.
What share of Guyana's power capacity is renewable?
Renewables — hydropower, wind, solar, geothermal and bioenergy — make up about 7.1% of operating power capacity in Guyana. Note that shares of capacity differ from shares of electricity generated, because technologies run for different numbers of hours.
Does Guyana have nuclear power plants?
No operating nuclear power plant is recorded in Guyana in the dataset.
Does Guyana have LNG terminals?
Yes. The dataset lists 1 LNG terminal projects in Guyana.
Energy news from Guyana
ExxonMobil Starts Uaru Production, Lifting Guyana’s Oil Capacity to 1.1 Million Barrels a Day
ExxonMobil Sanctions Longtail, Its Eighth Project Offshore Guyana
Brazil’s Energy Sector: Pre-Salt Oil and Renewables
Chevron Company Profile: Business, History and Strategy
What Is OPEC+ and How Does It Control Oil Supply?
Countries With the Largest Oil Reserves