Gas pipelines in Estonia

This list ranks all 11 gas pipelines tracked in Estonia by capacity, including operating, under-construction, planned, shelved and retired projects. 9 of them are operating, with a combined capacity of 22.4 bcm/y.

Open the interactive map →
#NameTypeCapacityStatusStart
1Leningrad-Vyborg-State Border Gas PipelineLeningrad OblastGas pipeline9.13 bcm/yOperating
2Kohtla-Järve-Leningrad Gas PipelineEstoniaGas pipeline5.40 bcm/yOperating1959
3Kohtla-Järve-Leningrad Gas PipelineEstoniaGas pipeline5.40 bcm/yOperating1948
4Valdai-Pskov-Riga Gas PipelineNovgorod OblastGas pipeline2.70 bcm/yOperating1972
5Balticconnector Gas PipelineSouthern FinlandGas pipeline2.60 bcm/yOperating2020
6Estonia-Latvia Interconnection Gas PipelineHarju CountyGas pipeline2.50 bcm/yOperating1992
7Kiili–Tallinn Gas PipelineGas pipelineOperating
8Kohtala-Jarve-Vuli Gas PipelineGas pipelineOperating
9Murati-Silivri PipelineGas pipelineOperating
10Tallinn–Narva Gas PipelineGas pipelineOperating
11Varska–Rakvere Gas PipelineGas pipelineOperating

Special projects