Country profile
Estonia energy infrastructure
Global Energy Monitor tracks 260 energy facilities in Estonia, including power plants with 2.30 GW of operating generating capacity. A further 344 MW is under construction and 14.0 GW is in planning stages.
Estonia's energy system at a glance
Estonia has 2.30 GW of operating power generation capacity across 210 plants in the Global Energy Monitor dataset. Solar is the largest source, with 1.05 GW or 46% of the total. It is followed by wind (30%) and oil & gas (20%).
Low-carbon sources — nuclear, hydropower, wind, solar, geothermal and bioenergy — make up 80% of operating capacity, while coal, oil and gas account for 20%. Wind and solar alone represent 75%.
A further 344 MW of generating capacity is under construction, led by solar (344 MW). Another 14.0 GW is announced, proposed or in pre-construction.
Beyond power generation, the map covers 11 gas pipeline projects (about 1,476 km in operation) and 3 LNG terminals in Estonia.
Operating power capacity by technology
- Solar 1.05 GW 46%
- Wind 688 MW 30%
- Oil & gas 458 MW 20%
- Bioenergy 105 MW 4.6%
Largest power plants in Estonia
| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Saare 2.1 wind farm | Wind | 1.56 GW | Pre-construction | 2030 |
| 2 | Liivi 2 wind farm | Wind | 1.40 GW | Announced | 2035 |
| 3 | Saare wind farm | Wind | 1.40 GW | Pre-construction | 2031 |
| 4 | Saare Liivi wind farm | Wind | 1.20 GW | Pre-construction | 2028 |
| 5 | Elwind wind farm | Wind | 1.00 GW | Pre-construction | 2033 |
| 6 | Gulf Of Riga wind farm | Wind | 1.00 GW | Pre-construction | 2032 |
| 7 | Tuul wind farm | Wind | 1.00 GW | Announced | |
| 8 | Liivi 1 wind farm | Wind | 900 MW | Announced | 2035 |
| 9 | Saare 1 wind farm | Wind | 900 MW | Pre-construction | 2033 |
| 10 | Saare 2.2 wind farm | Wind | 840 MW | Pre-construction |
Pipeline: capacity under construction
- Solar 344 MW 100%
Gas & oil power plants in Estonia
See all 4 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Kiisa ERPP power stationHarjumaa | Oil & gas | 251 MW | 2013 | |
| 2 | IRU Elektrijaam power stationHarjumaa | Oil & gas | 207 MW | 1982 | |
| 3 | Iru peaking power plantHarjumaa | Oil & gas | 200 MW | Announced | |
| 4 | Narva peaking power plantIda-Virumaa | Oil & gas | 100 MW | Pre-construction | 2028 |
Nuclear power plants in Estonia
See all 1 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Fermi Energia nuclear power plantIda-Virumaa | Nuclear | 600 MW | Announced | 2035 |
Hydropower plants in Estonia
See all 2 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Zero Terrain hydroelectric plant | Hydropower | 550 MW | Pre-construction | 2029 |
| 2 | Ida-Virumaa hydroelectric plant | Hydropower | 225 MW | Pre-construction | 2026 |
Wind farms in Estonia
See all 28 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Saare 2.1 wind farm | Wind | 1.56 GW | Pre-construction | 2030 |
| 2 | Liivi 2 wind farm | Wind | 1.40 GW | Announced | 2035 |
| 3 | Saare wind farm | Wind | 1.40 GW | Pre-construction | 2031 |
| 4 | Saare Liivi wind farm | Wind | 1.20 GW | Pre-construction | 2028 |
| 5 | Elwind wind farm | Wind | 1.00 GW | Pre-construction | 2033 |
Solar farms in Estonia
See all 192 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Risti solar farm | Solar | 244 MW | Construction | 2027 |
| 2 | Estiko Raadi solar farmTartu County | Solar | 100 MW | Construction | |
| 3 | Kirikmäe solar farm | Solar | 77 MW | 2024 | |
| 4 | Sopi solar farm | Solar | 74 MW | 2025 | |
| 5 | Laaneranna solar farmPärnu County | Solar | 70 MW | 2024 |
Bioenergy power plants in Estonia
See all 5 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Ida-Viru County Pulp Mill power stationIda-Virumaa | Bioenergy | 91 MW | Announced | |
| 2 | Väo power stationHarjumaa | Bioenergy | 46 MW | 2009 | |
| 3 | Tartu power stationTartumaa | Bioenergy | 25 MW | 2009 | |
| 4 | Pärnu power stationPärnumaa | Bioenergy | 24 MW | 2011 | |
| 5 | Mustamäe power stationHarjumaa | Bioenergy | 10 MW | 2019 |
Gas pipelines in Estonia
See all 11 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Leningrad-Vyborg-State Border Gas PipelineLeningrad Oblast | Gas pipeline | 9.13 bcm/y | ||
| 2 | Kohtla-Järve-Leningrad Gas PipelineEstonia | Gas pipeline | 5.40 bcm/y | 1959 | |
| 3 | Kohtla-Järve-Leningrad Gas PipelineEstonia | Gas pipeline | 5.40 bcm/y | 1948 | |
| 4 | Valdai-Pskov-Riga Gas PipelineNovgorod Oblast | Gas pipeline | 2.70 bcm/y | 1972 | |
| 5 | Balticconnector Gas PipelineSouthern Finland | Gas pipeline | 2.60 bcm/y | 2020 |
LNG terminals in Estonia
See all 3 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Tallinn LNG TerminalHarju | LNG import terminal | 2.94 mtpa | Proposed | |
| 2 | Paldiski LNG TerminalHarju | LNG import terminal | 1.84 mtpa | Shelved | |
| 3 | Paldiski FSRU | LNG import terminal | Construction |
Frequently asked questions
How much power generation capacity does Estonia have?
Global Energy Monitor tracks 2.30 GW of operating power plant capacity in Estonia, counting plants of all technologies above the trackers' size thresholds.
What share of Estonia's power capacity is renewable?
Renewables — hydropower, wind, solar, geothermal and bioenergy — make up about 80% of operating power capacity in Estonia. Note that shares of capacity differ from shares of electricity generated, because technologies run for different numbers of hours.
Does Estonia have nuclear power plants?
No operating nuclear power plant is recorded in Estonia in the dataset.
Does Estonia have LNG terminals?
Yes. The dataset lists 3 LNG terminal projects in Estonia.