Nuclear · China

Xudapu nuclear power plant

Xudapu nuclear power plant is a 7.63 GW nuclear power plant located in Liaoning, China. The facility is currently under construction, with a targeted start date of 2027.

7.63 GWCapacity (all phases)
ConstructionStatus
2027Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 6 units or phases at this site (under construction 5.13 GW, planned 2.50 GW).

Technology: pressurized water reactor.

Ownership: China National Nuclear Power Co Ltd.

4 further units or phases are scheduled to come online in 2027–2029.

Why it matters

  • The 2nd-largest nuclear power plant in China by capacity (of 32 operating, under-construction and planned nuclear facilities tracked).
  • If completed, it would add 7.63 GW to China's nuclear fleet — equivalent to 12% of today's operating nuclear capacity.
  • Ranks #4 worldwide among nuclear facilities of the same status group by capacity.

Nuclear plants supply large volumes of low-carbon baseload electricity with very high capacity factors, so a single station can cover a significant share of national demand.

Nuclear power in China

China has 64.6 GW of operating nuclear capacity across 18 plants in the Global Energy Monitor dataset — 2.1% of the country's total operating power capacity of 3,086.2 GW.

The nuclear pipeline in China includes 51.0 GW under construction and 24.5 GW at earlier planning stages.

Other major nuclear plants in China include Bailong nuclear power plant (8.10 GW), Lianjiang nuclear power plant (7.45 GW) and Lufeng nuclear power plant (7.35 GW).

See the full list: Nuclear power plants in China →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
1-1 1.29 GW Construction pressurized water reactor 2028
1-2 1.29 GW Construction pressurized water reactor 2029
2-3 1.27 GW Construction pressurized water reactor 2027
2-4 1.27 GW Construction pressurized water reactor 2028
3-5 1.25 GW Announced pressurized water reactor
3-6 1.25 GW Announced pressurized water reactor

How nuclear power plants work

A nuclear power plant uses heat from controlled fission of uranium (or plutonium) fuel in a reactor core to produce steam, which drives a turbine-generator in the same way as a thermal power station. The reactor is surrounded by multiple safety barriers and a containment building.

Nuclear units typically run more than 90% of the hours in a year, so a single large reactor can supply several terawatt-hours of almost carbon-free electricity annually. Construction times are long and capital costs high, but fuel costs are low and plants are often licensed to operate for 60 years or more.

Technology at Xudapu nuclear power plant

Pressurised water reactors (PWR), the most common reactor type worldwide, keep the primary coolant under high pressure and transfer its heat to a separate steam circuit.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Xudapu nuclear power plant is located in Liaoning, China, at approximately 40.3528, 120.5486. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Xudapu nuclear power plant is owned by China National Nuclear Power Co Ltd. Across the dataset, China National Nuclear Power Co Ltd is linked to 34 power plants with 27.2 GW of operating capacity.

Frequently asked questions

What is the capacity of Xudapu nuclear power plant?

Xudapu nuclear power plant has a capacity of 7.63 GW according to the latest Global Energy Monitor data. This figure covers the 6 units or phases listed for the site.

What type of facility is Xudapu nuclear power plant?

Xudapu nuclear power plant is a nuclear power plant. Pressurised water reactors (PWR), the most common reactor type worldwide, keep the primary coolant under high pressure and transfer its heat to a separate steam circuit.

Who owns Xudapu nuclear power plant?

Xudapu nuclear power plant is owned by China National Nuclear Power Co Ltd.

Where is Xudapu nuclear power plant located?

It is located in Liaoning, China. Approximate coordinates: 40.3528, 120.5486.

Is Xudapu nuclear power plant operational?

According to the latest data, Xudapu nuclear power plant is under construction. Under construction means physical work has started on site but the facility is not yet in commercial service.

When is Xudapu nuclear power plant expected to start?

Start year: 2027. Current status: Construction. 4 further units or phases are scheduled to come online in 2027–2029.

How big is Xudapu nuclear power plant compared with other facilities in China?

Xudapu nuclear power plant ranks #2 by capacity among 32 comparable nuclear facilities tracked in China.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.