Nuclear · China

Bailong nuclear power plant

Bailong nuclear power plant is a 8.10 GW nuclear power plant located in Guangxi, China. The facility is currently under construction, with a targeted start date of 2030.

8.10 GWCapacity (all phases)
ConstructionStatus
2030Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 6 units or phases at this site (under construction 1.25 GW, planned 6.85 GW).

Technology: pressurized water reactor.

Ownership: State Nuclear Power Technology Co Ltd.

1 further units or phases are scheduled to come online in 2030.

Why it matters

  • The largest nuclear power plant in China by capacity, out of 32 operating, under-construction and planned nuclear facilities tracked in the country.
  • If completed, it would add 8.10 GW to China's nuclear fleet — equivalent to 13% of today's operating nuclear capacity.
  • Ranks #3 worldwide among nuclear facilities of the same status group by capacity.

Nuclear plants supply large volumes of low-carbon baseload electricity with very high capacity factors, so a single station can cover a significant share of national demand.

Nuclear power in China

China has 64.6 GW of operating nuclear capacity across 18 plants in the Global Energy Monitor dataset — 2.1% of the country's total operating power capacity of 3,086.2 GW.

The nuclear pipeline in China includes 51.0 GW under construction and 24.5 GW at earlier planning stages.

Other major nuclear plants in China include Xudapu nuclear power plant (7.63 GW), Lianjiang nuclear power plant (7.45 GW) and Lufeng nuclear power plant (7.35 GW).

See the full list: Nuclear power plants in China →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
1-1 1.25 GW Construction pressurized water reactor 2030
1-2 1.25 GW Pre-construction pressurized water reactor
3 1.40 GW Announced pressurized water reactor
4 1.40 GW Announced pressurized water reactor
5 1.40 GW Announced pressurized water reactor
6 1.40 GW Announced pressurized water reactor

How nuclear power plants work

A nuclear power plant uses heat from controlled fission of uranium (or plutonium) fuel in a reactor core to produce steam, which drives a turbine-generator in the same way as a thermal power station. The reactor is surrounded by multiple safety barriers and a containment building.

Nuclear units typically run more than 90% of the hours in a year, so a single large reactor can supply several terawatt-hours of almost carbon-free electricity annually. Construction times are long and capital costs high, but fuel costs are low and plants are often licensed to operate for 60 years or more.

Technology at Bailong nuclear power plant

Pressurised water reactors (PWR), the most common reactor type worldwide, keep the primary coolant under high pressure and transfer its heat to a separate steam circuit.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Bailong nuclear power plant is located in Guangxi, China, at approximately 21.5065, 108.2242. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Bailong nuclear power plant is owned by State Nuclear Power Technology Co Ltd. Across the dataset, State Nuclear Power Technology Co Ltd is linked to 4 power plants with 198 MW of operating capacity.

Frequently asked questions

What is the capacity of Bailong nuclear power plant?

Bailong nuclear power plant has a capacity of 8.10 GW according to the latest Global Energy Monitor data. This figure covers the 6 units or phases listed for the site.

What type of facility is Bailong nuclear power plant?

Bailong nuclear power plant is a nuclear power plant. Pressurised water reactors (PWR), the most common reactor type worldwide, keep the primary coolant under high pressure and transfer its heat to a separate steam circuit.

Who owns Bailong nuclear power plant?

Bailong nuclear power plant is owned by State Nuclear Power Technology Co Ltd.

Where is Bailong nuclear power plant located?

It is located in Guangxi, China. Approximate coordinates: 21.5065, 108.2242.

Is Bailong nuclear power plant operational?

According to the latest data, Bailong nuclear power plant is under construction. Under construction means physical work has started on site but the facility is not yet in commercial service.

When is Bailong nuclear power plant expected to start?

Start year: 2030. Current status: Construction. 1 further units or phases are scheduled to come online in 2030.

How big is Bailong nuclear power plant compared with other facilities in China?

Bailong nuclear power plant ranks #1 by capacity among 32 comparable nuclear facilities tracked in China.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.