Nuclear · United States

Turkey Point nuclear power station

Turkey Point nuclear power station is a 1.66 GW nuclear power plant located in Florida, United States. The facility is currently in operation, with its first unit entering service in 1972.

1.66 GWCapacity
OperatingStatus
1972Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 4 units or phases at this site (operating 1.66 GW, planned 2.50 GW).

Technology: pressurized water reactor.

Ownership: Florida Power & Light Co.

Its 2 operating units were commissioned between 1972 and 1973. 2 further units or phases are scheduled to come online in 2036.

Why it matters

  • Provides about 1.6% of United States's operating nuclear capacity.
  • At a typical capacity factor of 85% for this technology, it would generate roughly 12 TWh of electricity a year (indicative estimate).

Nuclear plants supply large volumes of low-carbon baseload electricity with very high capacity factors, so a single station can cover a significant share of national demand.

Nuclear power in United States

United States has 102.5 GW of operating nuclear capacity across 54 plants in the Global Energy Monitor dataset — 8% of the country's total operating power capacity of 1,280.9 GW.

The nuclear pipeline in United States includes 3.57 GW under construction and 15.9 GW at earlier planning stages.

Other major nuclear plants in United States include Alvin W Vogtle nuclear power plant (4.96 GW), Palo Verde nuclear power plant (4.24 GW) and Browns Ferry nuclear power plant (3.78 GW).

See the full list: Nuclear power plants in United States →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
3 829 MW Operating pressurized water reactor 1972
4 829 MW Operating pressurized water reactor 1973
6 1.25 GW Pre-construction pressurized water reactor 2036
7 1.25 GW Pre-construction pressurized water reactor 2036

How nuclear power plants work

A nuclear power plant uses heat from controlled fission of uranium (or plutonium) fuel in a reactor core to produce steam, which drives a turbine-generator in the same way as a thermal power station. The reactor is surrounded by multiple safety barriers and a containment building.

Nuclear units typically run more than 90% of the hours in a year, so a single large reactor can supply several terawatt-hours of almost carbon-free electricity annually. Construction times are long and capital costs high, but fuel costs are low and plants are often licensed to operate for 60 years or more.

Technology at Turkey Point nuclear power station

Pressurised water reactors (PWR), the most common reactor type worldwide, keep the primary coolant under high pressure and transfer its heat to a separate steam circuit.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Turkey Point nuclear power station is located in Florida, United States, at approximately 25.4345, -80.3324. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Turkey Point nuclear power station is owned by Florida Power & Light Co. Across the dataset, Florida Power & Light Co is linked to 113 power plants with 38.5 GW of operating capacity.

Frequently asked questions

What is the capacity of Turkey Point nuclear power station?

Turkey Point nuclear power station has a capacity of 1.66 GW according to the latest Global Energy Monitor data. This figure covers the 4 units or phases listed for the site.

What type of facility is Turkey Point nuclear power station?

Turkey Point nuclear power station is a nuclear power plant. Pressurised water reactors (PWR), the most common reactor type worldwide, keep the primary coolant under high pressure and transfer its heat to a separate steam circuit.

Who owns Turkey Point nuclear power station?

Turkey Point nuclear power station is owned by Florida Power & Light Co.

Where is Turkey Point nuclear power station located?

It is located in Florida, United States. Approximate coordinates: 25.4345, -80.3324.

Is Turkey Point nuclear power station operational?

According to the latest data, Turkey Point nuclear power station is in operation. Operating means the facility is built and in commercial service.

When did Turkey Point nuclear power station start operating?

Start year: 1972. Current status: Operating. Its 2 operating units were commissioned between 1972 and 1973. 2 further units or phases are scheduled to come online in 2036.

How much electricity does Turkey Point nuclear power station generate?

Actual output data are not published for every plant. As an indicative estimate, Turkey Point nuclear power station would produce about 12 TWh a year, assuming a capacity factor of 85%, which is typical for this technology.

How big is Turkey Point nuclear power station compared with other facilities in United States?

Turkey Point nuclear power station ranks #33 by capacity among 54 comparable nuclear facilities tracked in United States.

Latest news on Turkey Point nuclear power station

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects