Global Energy Monitor tracks 7 units or phases at this site (operating 1.77 GW, planned 1.31 GW).
Technology: subcritical, steam turbine; fuel: coal: subbituminous, natural gas.
Ownership: Tucson Electric Power Co (parent company: Fortis Inc).
Its 4 operating units were commissioned between 1985 and 2009. 3 further units or phases are scheduled to come online in 2029–2030. 4 operating units have a planned retirement date, the earliest in 2029.
Why it matters
- At a typical capacity factor of 40% for this technology, it would generate roughly 6.2 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in United States
United States has 590.9 GW of operating oil & gas capacity across 1,106 plants in the Global Energy Monitor dataset — 46% of the country's total operating power capacity of 1,280.9 GW.
The oil & gas pipeline in United States includes 29.4 GW under construction and 257.6 GW at earlier planning stages.
Other major oil & gas plants in United States include West County energy center (4.26 GW), Bruce Mansfield power station (3.64 GW) and Crystal River Energy Complex (3.45 GW).
See the full list: Gas & oil power plants in United States →
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Unit 1, Timepoint 1 | 425 MW | subcritical | 1985 | 2030 | |
| Unit 1, Timepoint 2 | 425 MW | Announced | steam turbine | 2030 | |
| Unit 2, Timepoint 1 | 425 MW | subcritical | 1990 | 2030 | |
| Unit 2, Timepoint 2 | 425 MW | Announced | steam turbine | 2030 | |
| Unit 3 | 458 MW | subcritical | 2006 | 2031 | |
| Unit 4, Timepoint 1 | 458 MW | subcritical | 2009 | 2029 | |
| Unit 4, Timepoint 2 | 458 MW | Announced | steam turbine | 2029 | 2029 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Springerville power station
Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity. Steam-turbine units burn fuel in a boiler to raise steam; they are generally older and less flexible than combined-cycle plants.
Location
Springerville power station is located in Arizona, United States, at approximately 34.3185, -109.1660. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Springerville power station is owned by Tucson Electric Power Co. The ultimate parent company is Fortis Inc. Across the dataset, Fortis Inc is linked to 14 power plants in 4 countries, with 3.20 GW of operating capacity.
Frequently asked questions
What is the capacity of Springerville power station?
Springerville power station has a capacity of 1.77 GW according to the latest Global Energy Monitor data. This figure covers the 7 units or phases listed for the site.
What type of facility is Springerville power station?
Springerville power station is a oil- and gas-fired power station. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Who owns Springerville power station?
Springerville power station is owned by Tucson Electric Power Co. The ultimate parent company is Fortis Inc.
Where is Springerville power station located?
It is located in Arizona, United States. Approximate coordinates: 34.3185, -109.1660.
Is Springerville power station operational?
According to the latest data, Springerville power station is in operation. Operating means the facility is built and in commercial service.
When did Springerville power station start operating?
Start year: 1985. Current status: Operating. Its 4 operating units were commissioned between 1985 and 2009. 3 further units or phases are scheduled to come online in 2029–2030. 4 operating units have a planned retirement date, the earliest in 2029.
How much electricity does Springerville power station generate?
Actual output data are not published for every plant. As an indicative estimate, Springerville power station would produce about 6.2 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Springerville power station compared with other facilities in United States?
Springerville power station ranks #37 by capacity among 1106 comparable oil & gas facilities tracked in United States.