Hydropower · Argentina

Salto Grande hydroelectric plant (Argentina-Uruguay)

Salto Grande hydroelectric plant (Argentina-Uruguay) is a 1.89 GW hydropower plant located in Entre Ríos Province, Argentina. The facility is currently in operation, with its first unit entering service in 1979.

1.89 GWCapacity
OperatingStatus
1979Start year
View on the interactive map →

Overview

Technology: conventional storage.

Ownership: Comisión Técnica Mixta (CTM).

Why it matters

  • The 2nd-largest hydropower plant in Argentina by capacity (of 29 operating hydropower facilities tracked).
  • Provides about 15% of Argentina's operating hydropower capacity and roughly 4.1% of all operating power capacity in the country in the dataset.
  • Ranks #88 worldwide among hydropower facilities of the same status group by capacity.
  • At a typical capacity factor of 40% for this technology, it would generate roughly 6.6 TWh of electricity a year (indicative estimate).

Hydropower provides renewable electricity and, where reservoirs exist, dispatchable output and storage that help stabilise the grid; output varies with rainfall and river flows.

Hydropower power in Argentina

Argentina has 12.4 GW of operating hydropower capacity across 29 plants in the Global Energy Monitor dataset — 27% of the country's total operating power capacity of 46.0 GW.

The hydropower pipeline in Argentina includes 360 MW under construction and 5.26 GW at earlier planning stages.

Other major hydropower plants in Argentina include Yacyretá hydroelectric plant (3.10 GW), Piedra Del Aguila hydroelectric plant (1.42 GW) and Chocón hydroelectric plant (1.20 GW).

See the full list: Hydropower plants in Argentina →

How hydropower plants work

Hydropower plants convert the energy of falling or flowing water into electricity: water passes through turbines placed at the foot of a dam or along a diversion channel, and the turbines drive generators. Output depends on the height of the water drop (the head) and the volume of water flowing.

Reservoir and pumped-storage schemes can store energy and release it within minutes, which makes hydropower one of the most flexible sources on the grid. Annual generation varies with rainfall and snowmelt, and large dams can have significant effects on river ecosystems and downstream water use.

Technology at Salto Grande hydroelectric plant (Argentina-Uruguay)

Its reservoir allows water to be stored and power to be dispatched when it is most needed.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Salto Grande hydroelectric plant (Argentina-Uruguay) is located in Entre Ríos Province, Argentina, at approximately -31.2751, -57.9385. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Salto Grande hydroelectric plant (Argentina-Uruguay) is owned by Comisión Técnica Mixta (CTM).

Frequently asked questions

What is the capacity of Salto Grande hydroelectric plant (Argentina-Uruguay)?

Salto Grande hydroelectric plant (Argentina-Uruguay) has a capacity of 1.89 GW according to the latest Global Energy Monitor data.

What type of facility is Salto Grande hydroelectric plant (Argentina-Uruguay)?

Salto Grande hydroelectric plant (Argentina-Uruguay) is a hydropower plant. Its reservoir allows water to be stored and power to be dispatched when it is most needed.

Who owns Salto Grande hydroelectric plant (Argentina-Uruguay)?

Salto Grande hydroelectric plant (Argentina-Uruguay) is owned by Comisión Técnica Mixta (CTM).

Where is Salto Grande hydroelectric plant (Argentina-Uruguay) located?

It is located in Entre Ríos Province, Argentina. Approximate coordinates: -31.2751, -57.9385.

Is Salto Grande hydroelectric plant (Argentina-Uruguay) operational?

According to the latest data, Salto Grande hydroelectric plant (Argentina-Uruguay) is in operation. Operating means the facility is built and in commercial service.

When did Salto Grande hydroelectric plant (Argentina-Uruguay) start operating?

Start year: 1979. Current status: Operating.

How much electricity does Salto Grande hydroelectric plant (Argentina-Uruguay) generate?

Actual output data are not published for every plant. As an indicative estimate, Salto Grande hydroelectric plant (Argentina-Uruguay) would produce about 6.6 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.

How big is Salto Grande hydroelectric plant (Argentina-Uruguay) compared with other facilities in Argentina?

Salto Grande hydroelectric plant (Argentina-Uruguay) ranks #2 by capacity among 29 comparable hydropower facilities tracked in Argentina.

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects