Overview
Global Energy Monitor tracks 6 units or phases at this site (operating 2.26 GW).
Technology: subcritical, supercritical; fuel: coal: unknown.
Ownership: The West Bengal Power Development Corporation Ltd.
Its 5 operating units were commissioned between 2007 and 2026.
Why it matters
- At a typical capacity factor of 50% for this technology, it would generate roughly 9.9 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in India
India has 253.8 GW of operating coal capacity across 285 plants in the Global Energy Monitor dataset — 52% of the country's total operating power capacity of 485.3 GW.
The coal pipeline in India includes 20.4 GW under construction and 35.6 GW at earlier planning stages.
Other major coal plants in India include Vindhyachal power station (4.76 GW), Mundra Thermal Power Project (Adani) (4.62 GW) and Ramagundam power station (4.20 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Stage II Unit 3 | 500 MW | subcritical | 2015 | ||
| Stage II Unit 4 | 500 MW | subcritical | 2016 | ||
| Stage III Unit 5 | 660 MW | supercritical | 2026 | ||
| Stage III Unit 6 | 660 MW | Cancelled | supercritical | ||
| Unit 1 | 300 MW | subcritical | 2007 | ||
| Unit 2 | 300 MW | subcritical | 2008 |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Sagardighi Thermal Power Station
Supercritical units operate above the critical pressure of water, reaching efficiencies of roughly 38–42% and lower emissions per megawatt-hour than subcritical units. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Location
Sagardighi Thermal Power Station is located in West Bengal, India, at approximately 24.3688, 88.1040. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Sagardighi Thermal Power Station is owned by The West Bengal Power Development Corporation Ltd. Across the dataset, The West Bengal Power Development Corporation Ltd is linked to 5 power plants with 4.92 GW of operating capacity.
Frequently asked questions
What is the capacity of Sagardighi Thermal Power Station?
Sagardighi Thermal Power Station has a capacity of 2.26 GW according to the latest Global Energy Monitor data. This figure covers the 6 units or phases listed for the site.
What type of facility is Sagardighi Thermal Power Station?
Sagardighi Thermal Power Station is a coal-fired power station. Supercritical units operate above the critical pressure of water, reaching efficiencies of roughly 38–42% and lower emissions per megawatt-hour than subcritical units.
Who owns Sagardighi Thermal Power Station?
Sagardighi Thermal Power Station is owned by The West Bengal Power Development Corporation Ltd.
Where is Sagardighi Thermal Power Station located?
It is located in West Bengal, India. Approximate coordinates: 24.3688, 88.1040.
Is Sagardighi Thermal Power Station operational?
According to the latest data, Sagardighi Thermal Power Station is in operation. Operating means the facility is built and in commercial service.
When did Sagardighi Thermal Power Station start operating?
Start year: 2007. Current status: Operating. Its 5 operating units were commissioned between 2007 and 2026.
How much electricity does Sagardighi Thermal Power Station generate?
Actual output data are not published for every plant. As an indicative estimate, Sagardighi Thermal Power Station would produce about 9.9 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is Sagardighi Thermal Power Station compared with other facilities in India?
Sagardighi Thermal Power Station ranks #27 by capacity among 285 comparable coal facilities tracked in India.