Oil & gas · Kuwait

Sabiya power plant

Sabiya power plant is a 7.05 GW oil- and gas-fired power station located in Jahra, Kuwait. The facility is currently in operation, with its first unit entering service in 1998.

7.05 GWCapacity
OperatingStatus
1998Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 27 units or phases at this site (operating 7.05 GW, under construction 1.15 GW).

Technology: gas turbine, steam turbine, combined cycle; fuel: natural gas, waste heat from natural gas, natural gas, fossil liquids: fuel oil, natural gas, fossil liquids: fuel oil, fossil liquids: crude oil.

Ownership: Ministry of Electricity and Water and Renewable Energy (Kuwait).

Its 25 operating units were commissioned between 1998 and 2020. 1 further units or phases are scheduled to come online in 2028.

Why it matters

  • The largest oil- and gas-fired power station in Kuwait by capacity, out of 8 operating oil & gas facilities tracked in the country.
  • Provides about 35% of Kuwait's operating oil & gas capacity and roughly 35% of all operating power capacity in the country in the dataset.
  • Ranks #2 worldwide among oil & gas facilities of the same status group by capacity.
  • At a typical capacity factor of 40% for this technology, it would generate roughly 25 TWh of electricity a year (indicative estimate).

Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.

Oil & gas power in Kuwait

Kuwait has 20.3 GW of operating oil & gas capacity across 8 plants in the Global Energy Monitor dataset — 100% of the country's total operating power capacity of 20.4 GW.

The oil & gas pipeline in Kuwait includes 13.8 GW at earlier planning stages.

Other major oil & gas plants in Kuwait include Az Zour South power plant (6.06 GW), Doha West power station (2.54 GW) and Az Zour North power plant (1.63 GW).

See the full list: Gas & oil power plants in Kuwait →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
2-GT1 63 MW Operating gas turbine 2009
2-GT2 63 MW Operating gas turbine 2009
2-GT3 63 MW Operating gas turbine 2009
2-GT4 63 MW Operating gas turbine 2009
4-GT1 250 MW Operating gas turbine 2016
4-GT2 250 MW Operating gas turbine 2016
4-ST1 250 MW Construction steam turbine
CC1-1 656 MW Operating combined cycle 2012
CC1-2 656 MW Operating combined cycle 2012
CC1-3 656 MW Operating combined cycle 2012
CC4-توسعة محطة الصبية (المرحلة الرابعة) 900 MW Construction combined cycle 2028
CC5 935 MW Operating combined cycle 2020
GT1- SBOC-2 42 MW Operating gas turbine 2008
GT2- SBOC-2 42 MW Operating gas turbine 2008
GT3- SBOC-2 42 MW Operating gas turbine 2008
GT4- SBOC-2 42 MW Operating gas turbine 2008
GT5- SBOC-2 42 MW Operating gas turbine 2008
GT6- SBOC-2 42 MW Operating gas turbine 2008
SBOC-8 750 MW Operating combined cycle 2019
ST1 300 MW Operating steam turbine 1998
ST2 300 MW Operating steam turbine 1998
ST3 300 MW Operating steam turbine 1999
ST4 300 MW Operating steam turbine 1999
ST5 300 MW Operating steam turbine 1999
ST6 300 MW Operating steam turbine 2000
ST7 300 MW Operating steam turbine 2000
ST8 300 MW Operating steam turbine 2000

How gas & oil power plants work

Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.

Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.

Technology at Sabiya power plant

Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant. Open-cycle gas turbines can start within minutes and are mainly used as peaking plants, at efficiencies of roughly 30–40%. Steam-turbine units burn fuel in a boiler to raise steam; they are generally older and less flexible than combined-cycle plants.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Sabiya power plant is located in Jahra, Kuwait, at approximately 29.5642, 48.1707. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Sabiya power plant is owned by Ministry of Electricity and Water and Renewable Energy (Kuwait). Across the dataset, Ministry of Electricity and Water and Renewable Energy (Kuwait) is linked to 9 power plants with 18.7 GW of operating capacity.

Frequently asked questions

What is the capacity of Sabiya power plant?

Sabiya power plant has a capacity of 7.05 GW according to the latest Global Energy Monitor data. This figure covers the 27 units or phases listed for the site.

What type of facility is Sabiya power plant?

Sabiya power plant is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.

Who owns Sabiya power plant?

Sabiya power plant is owned by Ministry of Electricity and Water and Renewable Energy (Kuwait).

Where is Sabiya power plant located?

It is located in Jahra, Kuwait. Approximate coordinates: 29.5642, 48.1707.

Is Sabiya power plant operational?

According to the latest data, Sabiya power plant is in operation. Operating means the facility is built and in commercial service.

When did Sabiya power plant start operating?

Start year: 1998. Current status: Operating. Its 25 operating units were commissioned between 1998 and 2020. 1 further units or phases are scheduled to come online in 2028.

How much electricity does Sabiya power plant generate?

Actual output data are not published for every plant. As an indicative estimate, Sabiya power plant would produce about 25 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.

How big is Sabiya power plant compared with other facilities in Kuwait?

Sabiya power plant ranks #1 by capacity among 8 comparable oil & gas facilities tracked in Kuwait.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.