Global Energy Monitor tracks 12 units or phases at this site (operating 1.12 GW).
Technology: combined cycle, gas turbine, steam turbine; fuel: natural gas, natural gas, fossil liquids: fuel oil.
Ownership: Ministry of Electricity and Water and Renewable Energy (Kuwait).
Its 11 operating units were commissioned between 1977 and 1981.
Why it matters
- The 5th-largest oil- and gas-fired power station in Kuwait by capacity (of 8 operating oil & gas facilities tracked).
- Provides about 5.5% of Kuwait's operating oil & gas capacity and roughly 5.5% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 40% for this technology, it would generate roughly 3.9 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Kuwait
Kuwait has 20.3 GW of operating oil & gas capacity across 8 plants in the Global Energy Monitor dataset — 100% of the country's total operating power capacity of 20.4 GW.
The oil & gas pipeline in Kuwait includes 13.8 GW at earlier planning stages.
Other major oil & gas plants in Kuwait include Sabiya power plant (7.05 GW), Az Zour South power plant (6.06 GW) and Doha West power station (2.54 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 2-1 | 2.40 GW | Cancelled | combined cycle | ||
| GT1 | 18 MW | gas turbine | 1981 | ||
| GT2 | 18 MW | gas turbine | 1981 | ||
| GT3 | 18 MW | gas turbine | 1981 | ||
| GT4 | 18 MW | gas turbine | 1981 | ||
| ST1 | 150 MW | steam turbine | 1977 | ||
| ST2 | 150 MW | steam turbine | 1977 | ||
| ST3 | 150 MW | steam turbine | 1978 | ||
| ST4 | 150 MW | steam turbine | 1978 | ||
| ST5 | 150 MW | steam turbine | 1979 | ||
| ST6 | 150 MW | steam turbine | 1979 | ||
| ST7 | 150 MW | steam turbine | 1979 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Doha East power plant
Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant. Open-cycle gas turbines can start within minutes and are mainly used as peaking plants, at efficiencies of roughly 30–40%. Steam-turbine units burn fuel in a boiler to raise steam; they are generally older and less flexible than combined-cycle plants.
Location
Doha East power plant is located in Jahra, Kuwait, at approximately 29.3682, 47.7963. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Doha East power plant is owned by Ministry of Electricity and Water and Renewable Energy (Kuwait). Across the dataset, Ministry of Electricity and Water and Renewable Energy (Kuwait) is linked to 9 power plants with 18.7 GW of operating capacity.
Frequently asked questions
What is the capacity of Doha East power plant?
Doha East power plant has a capacity of 1.12 GW according to the latest Global Energy Monitor data. This figure covers the 12 units or phases listed for the site.
What type of facility is Doha East power plant?
Doha East power plant is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Who owns Doha East power plant?
Doha East power plant is owned by Ministry of Electricity and Water and Renewable Energy (Kuwait).
Where is Doha East power plant located?
It is located in Jahra, Kuwait. Approximate coordinates: 29.3682, 47.7963.
Is Doha East power plant operational?
According to the latest data, Doha East power plant is in operation. Operating means the facility is built and in commercial service.
When did Doha East power plant start operating?
Start year: 1977. Current status: Operating. Its 11 operating units were commissioned between 1977 and 1981.
How much electricity does Doha East power plant generate?
Actual output data are not published for every plant. As an indicative estimate, Doha East power plant would produce about 3.9 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Doha East power plant compared with other facilities in Kuwait?
Doha East power plant ranks #5 by capacity among 8 comparable oil & gas facilities tracked in Kuwait.