Overview
Global Energy Monitor tracks 7 units or phases at this site (operating 2.69 GW).
Technology: combined cycle, gas turbine; fuel: natural gas, fossil liquids: fuel oil.
Ownership: Saline Water Conversion Corp Corp.
Why it matters
- The 11th-largest oil- and gas-fired power station in Saudi Arabia by capacity (of 97 operating oil & gas facilities tracked).
- Provides about 2.7% of Saudi Arabia's operating oil & gas capacity and roughly 2.4% of all operating power capacity in the country in the dataset.
- Ranks #70 worldwide among oil & gas facilities of the same status group by capacity.
- At a typical capacity factor of 40% for this technology, it would generate roughly 9.4 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Saudi Arabia
Saudi Arabia has 100.6 GW of operating oil & gas capacity across 97 plants in the Global Energy Monitor dataset — 89% of the country's total operating power capacity of 112.6 GW.
The oil & gas pipeline in Saudi Arabia includes 14.9 GW under construction and 6.00 GW at earlier planning stages.
Other major oil & gas plants in Saudi Arabia include Rabigh 1 power plant (4.48 GW), Ghazlan power plant (4.26 GW) and Qurayyah CC power plant (4.10 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 | 450 MW | combined cycle | 2014 | ||
| 2 | 450 MW | combined cycle | 2014 | ||
| 3 | 450 MW | combined cycle | 2014 | ||
| 4 | 450 MW | combined cycle | 2014 | ||
| 5 | 450 MW | combined cycle | 2014 | ||
| 6-GT1 | 220 MW | gas turbine | 2014 | ||
| 6-GT2 | 220 MW | gas turbine | 2014 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Ras Al-Khair power plant
Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant. Open-cycle gas turbines can start within minutes and are mainly used as peaking plants, at efficiencies of roughly 30–40%.
Location
Ras Al-Khair power plant is located in Eastern, Saudi Arabia, at approximately 27.5367, 49.1389. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Ras Al-Khair power plant is owned by Saline Water Conversion Corp Corp. Across the dataset, Saline Water Conversion Corp Corp is linked to 8 power plants with 9.55 GW of operating capacity.
Frequently asked questions
What is the capacity of Ras Al-Khair power plant?
Ras Al-Khair power plant has a capacity of 2.69 GW according to the latest Global Energy Monitor data. This figure covers the 7 units or phases listed for the site.
What type of facility is Ras Al-Khair power plant?
Ras Al-Khair power plant is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Who owns Ras Al-Khair power plant?
Ras Al-Khair power plant is owned by Saline Water Conversion Corp Corp.
Where is Ras Al-Khair power plant located?
It is located in Eastern, Saudi Arabia. Approximate coordinates: 27.5367, 49.1389.
Is Ras Al-Khair power plant operational?
According to the latest data, Ras Al-Khair power plant is in operation. Operating means the facility is built and in commercial service.
When did Ras Al-Khair power plant start operating?
Start year: 2014. Current status: Operating.
How much electricity does Ras Al-Khair power plant generate?
Actual output data are not published for every plant. As an indicative estimate, Ras Al-Khair power plant would produce about 9.4 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Ras Al-Khair power plant compared with other facilities in Saudi Arabia?
Ras Al-Khair power plant ranks #11 by capacity among 97 comparable oil & gas facilities tracked in Saudi Arabia.