Oil & gas · Qatar

Mesaieed CCGT power station

Mesaieed CCGT power station is a 2.01 GW oil- and gas-fired power station located in Wakra, Qatar. The facility is currently in operation, with its first unit entering service in 2010.

2.01 GWCapacity
OperatingStatus
2010Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 3 units or phases at this site (operating 2.01 GW).

Technology: combined cycle; fuel: natural gas.

Ownership: Mesaieed Power Co (parent company: RLC Power Holding Co; Nebras Energy QPSC; unknown; QatarEnergy).

Why it matters

  • The 3rd-largest oil- and gas-fired power station in Qatar by capacity (of 10 operating oil & gas facilities tracked).
  • Provides about 16% of Qatar's operating oil & gas capacity and roughly 14% of all operating power capacity in the country in the dataset.
  • At a typical capacity factor of 40% for this technology, it would generate roughly 7.0 TWh of electricity a year (indicative estimate).

Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.

Oil & gas power in Qatar

Qatar has 12.6 GW of operating oil & gas capacity across 10 plants in the Global Energy Monitor dataset — 88% of the country's total operating power capacity of 14.3 GW.

The oil & gas pipeline in Qatar includes 2.92 GW under construction.

Other major oil & gas plants in Qatar include Ras Laffan C power plant (2.73 GW), Umm Al Houl power plant (2.52 GW) and Ras Abu Fontas (E) power plant (2.42 GW).

See the full list: Gas & oil power plants in Qatar →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
1 669 MW Operating combined cycle 2010
2 669 MW Operating combined cycle 2010
3 669 MW Operating combined cycle 2010

How gas & oil power plants work

Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.

Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.

Technology at Mesaieed CCGT power station

Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Mesaieed CCGT power station is located in Wakra, Qatar, at approximately 24.9753, 51.5783. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Mesaieed CCGT power station is owned by Mesaieed Power Co. The ultimate parent company is RLC Power Holding Co; Nebras Energy QPSC; unknown; QatarEnergy.

Frequently asked questions

What is the capacity of Mesaieed CCGT power station?

Mesaieed CCGT power station has a capacity of 2.01 GW according to the latest Global Energy Monitor data. This figure covers the 3 units or phases listed for the site.

What type of facility is Mesaieed CCGT power station?

Mesaieed CCGT power station is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.

Who owns Mesaieed CCGT power station?

Mesaieed CCGT power station is owned by Mesaieed Power Co. The ultimate parent company is RLC Power Holding Co; Nebras Energy QPSC; unknown; QatarEnergy.

Where is Mesaieed CCGT power station located?

It is located in Wakra, Qatar. Approximate coordinates: 24.9753, 51.5783.

Is Mesaieed CCGT power station operational?

According to the latest data, Mesaieed CCGT power station is in operation. Operating means the facility is built and in commercial service.

When did Mesaieed CCGT power station start operating?

Start year: 2010. Current status: Operating.

How much electricity does Mesaieed CCGT power station generate?

Actual output data are not published for every plant. As an indicative estimate, Mesaieed CCGT power station would produce about 7.0 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.

How big is Mesaieed CCGT power station compared with other facilities in Qatar?

Mesaieed CCGT power station ranks #3 by capacity among 10 comparable oil & gas facilities tracked in Qatar.

Nearby energy infrastructure

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects