Hydropower · Kyrgyzstan

Kambarata-1 hydroelectric plant

Kambarata-1 hydroelectric plant is a 1.86 GW hydropower plant located in Jalal-Abad Region, Kyrgyzstan. The facility is currently under construction, with a targeted start date of 2034.

1.86 GWCapacity (all phases)
ConstructionStatus
2034Start year
View on the interactive map →

Overview

Technology: conventional storage.

Ownership: Power Stations JSC (Elektricheskiye Stantsii).

Why it matters

  • The largest hydropower plant in Kyrgyzstan by capacity, out of 28 operating, under-construction and planned hydropower facilities tracked in the country.
  • If completed, it would add 1.86 GW to Kyrgyzstan's hydropower fleet — equivalent to 59% of today's operating hydropower capacity.

Hydropower provides renewable electricity and, where reservoirs exist, dispatchable output and storage that help stabilise the grid; output varies with rainfall and river flows.

Hydropower power in Kyrgyzstan

Kyrgyzstan has 3.18 GW of operating hydropower capacity across 8 plants in the Global Energy Monitor dataset — 79% of the country's total operating power capacity of 4.04 GW.

The hydropower pipeline in Kyrgyzstan includes 1.86 GW under construction and 5.15 GW at earlier planning stages.

Other major hydropower plants in Kyrgyzstan include Toktogul hydroelectric plant (1.32 GW).

See the full list: Hydropower plants in Kyrgyzstan →

How hydropower plants work

Hydropower plants convert the energy of falling or flowing water into electricity: water passes through turbines placed at the foot of a dam or along a diversion channel, and the turbines drive generators. Output depends on the height of the water drop (the head) and the volume of water flowing.

Reservoir and pumped-storage schemes can store energy and release it within minutes, which makes hydropower one of the most flexible sources on the grid. Annual generation varies with rainfall and snowmelt, and large dams can have significant effects on river ecosystems and downstream water use.

Technology at Kambarata-1 hydroelectric plant

Its reservoir allows water to be stored and power to be dispatched when it is most needed.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Kambarata-1 hydroelectric plant is located in Jalal-Abad Region, Kyrgyzstan, at approximately 41.7742, 73.4367. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Kambarata-1 hydroelectric plant is owned by Power Stations JSC (Elektricheskiye Stantsii). Across the dataset, Power Stations JSC (Elektricheskiye Stantsii) is linked to 22 power plants with 3.11 GW of operating capacity.

Frequently asked questions

What is the capacity of Kambarata-1 hydroelectric plant?

Kambarata-1 hydroelectric plant has a capacity of 1.86 GW according to the latest Global Energy Monitor data.

What type of facility is Kambarata-1 hydroelectric plant?

Kambarata-1 hydroelectric plant is a hydropower plant. Its reservoir allows water to be stored and power to be dispatched when it is most needed.

Who owns Kambarata-1 hydroelectric plant?

Kambarata-1 hydroelectric plant is owned by Power Stations JSC (Elektricheskiye Stantsii).

Where is Kambarata-1 hydroelectric plant located?

It is located in Jalal-Abad Region, Kyrgyzstan. Approximate coordinates: 41.7742, 73.4367.

Is Kambarata-1 hydroelectric plant operational?

According to the latest data, Kambarata-1 hydroelectric plant is under construction. Under construction means physical work has started on site but the facility is not yet in commercial service.

When is Kambarata-1 hydroelectric plant expected to start?

Start year: 2034. Current status: Construction.

How big is Kambarata-1 hydroelectric plant compared with other facilities in Kyrgyzstan?

Kambarata-1 hydroelectric plant ranks #1 by capacity among 28 comparable hydropower facilities tracked in Kyrgyzstan.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects