Overview
GEM tracks 4 units or phases at this site (operating 449 MW, retired 201 MW).
Technology: Onshore.
Why it matters
- Wind output varies with weather, so large wind farms depend on transmission capacity and system flexibility to deliver their power to demand centres.
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 | 201 MW | Retired | Onshore | 2009 | |
| 2 | 200 MW | Onshore | 2012 | ||
| 2 (expansion) | 49 MW | Onshore | 2014 | ||
| RP | 200 MW | Onshore |
Location
Frequently asked questions
What is the capacity of Jiangsu Dongtai (Guohua) wind farm?
Jiangsu Dongtai (Guohua) wind farm has a capacity of 449 MW according to the latest Global Energy Monitor data.
Where is Jiangsu Dongtai (Guohua) wind farm located?
It is located in Jiangsu, China. Approximate coordinates: 32.7859, 120.8956.
When did Jiangsu Dongtai (Guohua) wind farm start operating?
Start year: 2012. Current status: Operating.
Nearby energy infrastructure
- Jiangsu Yancheng Dongtai DT2 offshore solar farm
- Jiangsu Yancheng Dongtai DT1 offshore solar farm
- jiangsu Yancheng Dafeng DF12 offshore solar farm
- jiangsu Yancheng Dafeng DF13 offshore solar farm
- jiangsu Yancheng Dafeng DF7 offshore solar farm
- jiangsu Yancheng Dafeng DF17 offshore solar farm
- jiangsu Yancheng Dafeng DF10 offshore solar farm
- jiangsu Yancheng Dafeng DF11 offshore solar farm