Overview
Global Energy Monitor tracks 4 units or phases at this site (operating 1.18 GW, under construction 450 MW, planned 350 MW).
Technology: combined cycle; fuel: natural gas, fossil liquids: fuel oil, natural gas.
Ownership: Public Establishment of Electricity Generation.
Its 2 operating units were commissioned between 1995 and 2011.
Why it matters
- The 2nd-largest oil- and gas-fired power station in Syria by capacity (of 15 operating oil & gas facilities tracked).
- Provides about 15% of Syria's operating oil & gas capacity and roughly 13% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 40% for this technology, it would generate roughly 4.1 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Syria
Syria has 7.66 GW of operating oil & gas capacity across 15 plants in the Global Energy Monitor dataset — 81% of the country's total operating power capacity of 9.44 GW.
The oil & gas pipeline in Syria includes 3.55 GW under construction and 3.70 GW at earlier planning stages.
Other major oil & gas plants in Syria include Deir Ali power station (1.50 GW), Teshreen power station (1.08 GW) and Deir El Zor Combind Cycle power plant (1.00 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 | 703 MW | combined cycle | 1995 | ||
| EXT1 | 480 MW | combined cycle | 2011 | ||
| EXT2 | 450 MW | Construction | combined cycle | ||
| EXT3 | 350 MW | Announced | combined cycle |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Jandar Gas power plant
Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Location
Jandar Gas power plant is located in Homs, Syria, at approximately 34.4660, 36.7833. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Jandar Gas power plant is owned by Public Establishment of Electricity Generation. Across the dataset, Public Establishment of Electricity Generation is linked to 21 power plants with 7.66 GW of operating capacity.
Frequently asked questions
What is the capacity of Jandar Gas power plant?
Jandar Gas power plant has a capacity of 1.18 GW according to the latest Global Energy Monitor data. This figure covers the 4 units or phases listed for the site.
What type of facility is Jandar Gas power plant?
Jandar Gas power plant is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Who owns Jandar Gas power plant?
Jandar Gas power plant is owned by Public Establishment of Electricity Generation.
Where is Jandar Gas power plant located?
It is located in Homs, Syria. Approximate coordinates: 34.4660, 36.7833.
Is Jandar Gas power plant operational?
According to the latest data, Jandar Gas power plant is in operation. Operating means the facility is built and in commercial service.
When did Jandar Gas power plant start operating?
Start year: 1995. Current status: Operating. Its 2 operating units were commissioned between 1995 and 2011.
How much electricity does Jandar Gas power plant generate?
Actual output data are not published for every plant. As an indicative estimate, Jandar Gas power plant would produce about 4.1 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Jandar Gas power plant compared with other facilities in Syria?
Jandar Gas power plant ranks #2 by capacity among 15 comparable oil & gas facilities tracked in Syria.