Overview
Global Energy Monitor tracks 5 units or phases at this site (operating 1.20 GW).
Technology: subcritical, supercritical, unknown; fuel: coal: bituminous, coal: lignite.
Ownership: Huaneng Hegang Power Generation Co Ltd (parent company: Huaneng Power International Inc; Heilongjiang Chenneng Investment Group Co Ltd; China Energy Investment Corp; Beijing Jingneng Power Co Ltd; Beijing…).
Its 3 operating units were commissioned between 1997 and 2007.
Why it matters
- At a typical capacity factor of 50% for this technology, it would generate roughly 5.3 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in China
China has 1,259.6 GW of operating coal capacity across 1,188 plants in the Global Energy Monitor dataset — 41% of the country's total operating power capacity of 3,086.2 GW.
The coal pipeline in China includes 93.1 GW under construction and 145.8 GW at earlier planning stages.
Other major coal plants in China include Beilun power station (7.10 GW), Pingwei power station (6.54 GW) and Togtoh power station (6.12 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Phase I Unit 1 | 300 MW | subcritical | 1997 | ||
| Phase I Unit 2 | 300 MW | subcritical | 1999 | ||
| Phase II Unit 3 | 600 MW | supercritical | 2007 | ||
| Phase III Unit 4 | 600 MW | Cancelled | unknown | ||
| Phase III Unit 5 | 600 MW | Cancelled | unknown |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Hegang power station
Supercritical units operate above the critical pressure of water, reaching efficiencies of roughly 38–42% and lower emissions per megawatt-hour than subcritical units. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Location
Hegang power station is located in Heilongjiang, China, at approximately 47.0963, 130.2990. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Hegang power station is owned by Huaneng Hegang Power Generation Co Ltd. The ultimate parent company is Huaneng Power International Inc; Heilongjiang Chenneng Investment Group Co Ltd; China Energy Investment Corp; Beijing Jingneng Power Co Ltd; Beijing State-owned Capital Management Center; unknown. Across the dataset, Huaneng Power International Inc is linked to 164 power plants in 3 countries, with 115.4 GW of operating capacity.
Frequently asked questions
What is the capacity of Hegang power station?
Hegang power station has a capacity of 1.20 GW according to the latest Global Energy Monitor data. This figure covers the 5 units or phases listed for the site.
What type of facility is Hegang power station?
Hegang power station is a coal-fired power station. Supercritical units operate above the critical pressure of water, reaching efficiencies of roughly 38–42% and lower emissions per megawatt-hour than subcritical units.
Who owns Hegang power station?
Hegang power station is owned by Huaneng Hegang Power Generation Co Ltd. The ultimate parent company is Huaneng Power International Inc; Heilongjiang Chenneng Investment Group Co Ltd; China Energy Investment Corp; Beijing Jingneng Power Co Ltd; Beijing State-owned Capital Management Center; unknown.
Where is Hegang power station located?
It is located in Heilongjiang, China. Approximate coordinates: 47.0963, 130.2990.
Is Hegang power station operational?
According to the latest data, Hegang power station is in operation. Operating means the facility is built and in commercial service.
When did Hegang power station start operating?
Start year: 1997. Current status: Operating. Its 3 operating units were commissioned between 1997 and 2007.
How much electricity does Hegang power station generate?
Actual output data are not published for every plant. As an indicative estimate, Hegang power station would produce about 5.3 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is Hegang power station compared with other facilities in China?
Hegang power station ranks #397 by capacity among 1188 comparable coal facilities tracked in China.