Nuclear · France

Flamanville nuclear power plant

Flamanville nuclear power plant is a 4.41 GW nuclear power plant located in Normandie, France. The facility is currently in operation, with its first unit entering service in 1986.

4.41 GWCapacity
OperatingStatus
1986Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 3 units or phases at this site (operating 4.41 GW).

Technology: pressurized water reactor.

Ownership: Electricité de France SA.

Its 3 operating units were commissioned between 1986 and 2024.

Why it matters

  • The 4th-largest nuclear power plant in France by capacity (of 18 operating nuclear facilities tracked).
  • Provides about 6.7% of France's operating nuclear capacity and roughly 3.2% of all operating power capacity in the country in the dataset.
  • Ranks #16 worldwide among nuclear facilities of the same status group by capacity.
  • At a typical capacity factor of 85% for this technology, it would generate roughly 33 TWh of electricity a year (indicative estimate).

Nuclear plants supply large volumes of low-carbon baseload electricity with very high capacity factors, so a single station can cover a significant share of national demand.

Nuclear power in France

France has 65.7 GW of operating nuclear capacity across 18 plants in the Global Energy Monitor dataset — 47% of the country's total operating power capacity of 140.0 GW.

Other major nuclear plants in France include Gravelines nuclear power plant (5.71 GW), Paluel nuclear power plant (5.53 GW) and Cattenom nuclear power plant (5.45 GW).

See the full list: Nuclear power plants in France →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
1 1.38 GW Operating pressurized water reactor 1986
2 1.38 GW Operating pressurized water reactor 1987
3 1.65 GW Operating pressurized water reactor 2024

How nuclear power plants work

A nuclear power plant uses heat from controlled fission of uranium (or plutonium) fuel in a reactor core to produce steam, which drives a turbine-generator in the same way as a thermal power station. The reactor is surrounded by multiple safety barriers and a containment building.

Nuclear units typically run more than 90% of the hours in a year, so a single large reactor can supply several terawatt-hours of almost carbon-free electricity annually. Construction times are long and capital costs high, but fuel costs are low and plants are often licensed to operate for 60 years or more.

Technology at Flamanville nuclear power plant

Pressurised water reactors (PWR), the most common reactor type worldwide, keep the primary coolant under high pressure and transfer its heat to a separate steam circuit.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Flamanville nuclear power plant is located in Normandie, France, at approximately 49.5366, -1.8823. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Flamanville nuclear power plant is owned by Electricité de France SA. Across the dataset, Electricité de France SA is linked to 166 power plants in 18 countries, with 86.0 GW of operating capacity.

Frequently asked questions

What is the capacity of Flamanville nuclear power plant?

Flamanville nuclear power plant has a capacity of 4.41 GW according to the latest Global Energy Monitor data. This figure covers the 3 units or phases listed for the site.

What type of facility is Flamanville nuclear power plant?

Flamanville nuclear power plant is a nuclear power plant. Pressurised water reactors (PWR), the most common reactor type worldwide, keep the primary coolant under high pressure and transfer its heat to a separate steam circuit.

Who owns Flamanville nuclear power plant?

Flamanville nuclear power plant is owned by Electricité de France SA.

Where is Flamanville nuclear power plant located?

It is located in Normandie, France. Approximate coordinates: 49.5366, -1.8823.

Is Flamanville nuclear power plant operational?

According to the latest data, Flamanville nuclear power plant is in operation. Operating means the facility is built and in commercial service.

When did Flamanville nuclear power plant start operating?

Start year: 1986. Current status: Operating. Its 3 operating units were commissioned between 1986 and 2024.

How much electricity does Flamanville nuclear power plant generate?

Actual output data are not published for every plant. As an indicative estimate, Flamanville nuclear power plant would produce about 33 TWh a year, assuming a capacity factor of 85%, which is typical for this technology.

How big is Flamanville nuclear power plant compared with other facilities in France?

Flamanville nuclear power plant ranks #4 by capacity among 18 comparable nuclear facilities tracked in France.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects