Overview
Global Energy Monitor tracks 16 units or phases at this site (operating 6.04 GW, planned 3.00 GW).
Technology: supercritical, unknown, combined cycle, ultra-supercritical; fuel: coal: bituminous, natural gas, LNG.
Ownership: Korea East-West Power Co Ltd (parent company: Korea Electric Power Corp).
Its 10 operating units were commissioned between 1999 and 2016. 6 further units or phases are scheduled to come online in 2029–2036. 10 operating units have a planned retirement date, the earliest in 2029.
Why it matters
- The largest coal-fired power station in South Korea by capacity, out of 24 operating coal facilities tracked in the country.
- Provides about 15% of South Korea's operating coal capacity and roughly 4.3% of all operating power capacity in the country in the dataset.
- Ranks #4 worldwide among coal facilities of the same status group by capacity.
- At a typical capacity factor of 50% for this technology, it would generate roughly 26 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in South Korea
South Korea has 39.4 GW of operating coal capacity across 24 plants in the Global Energy Monitor dataset — 28% of the country's total operating power capacity of 142.0 GW.
Other major coal plants in South Korea include Taean power station (5.95 GW), Yeongheung power station (5.08 GW) and Boryeong power station (4.40 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Unit 1, timepoint 1 | 500 MW | supercritical | 1999 | 2029 | |
| Unit 1, timepoint 2 | 500 MW | Announced | unknown | 2029 | |
| Unit 2, timepoint 1 | 500 MW | supercritical | 1999 | 2029 | |
| Unit 2, timepoint 2 | 500 MW | Announced | unknown | 2029 | |
| Unit 3, timepoint 1 | 500 MW | supercritical | 2000 | 2030 | |
| Unit 3, timepoint 2 | 500 MW | Announced | combined cycle | 2030 | |
| Unit 4, timepoint 1 | 500 MW | supercritical | 2001 | 2030 | |
| Unit 4, timepoint 2 | 500 MW | Announced | combined cycle | 2030 | |
| Unit 5, timepoint 1 | 500 MW | ultra-supercritical | 2005 | 2035 | |
| Unit 5, timepoint 2 | 500 MW | Announced | unknown | 2036 | |
| Unit 6, timepoint 1 | 500 MW | ultra-supercritical | 2006 | 2036 | |
| Unit 6, timepoint 2 | 500 MW | Announced | unknown | 2036 | |
| Unit 7 | 500 MW | ultra-supercritical | 2007 | 2037 | |
| Unit 8 | 500 MW | ultra-supercritical | 2007 | 2037 | |
| Unit 9 | 1.02 GW | ultra-supercritical | 2016 | 2047 | |
| Unit 10 | 1.02 GW | ultra-supercritical | 2016 | 2046 |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Dangjin power station
Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Location
Dangjin power station is located in South Chungcheong, South Korea, at approximately 37.0551, 126.5113. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Dangjin power station is owned by Korea East-West Power Co Ltd. The ultimate parent company is Korea Electric Power Corp. Across the dataset, Korea Electric Power Corp is linked to 99 power plants in 15 countries, with 91.2 GW of operating capacity.
Frequently asked questions
What is the capacity of Dangjin power station?
Dangjin power station has a capacity of 6.04 GW according to the latest Global Energy Monitor data. This figure covers the 16 units or phases listed for the site.
What type of facility is Dangjin power station?
Dangjin power station is a coal-fired power station. Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%.
Who owns Dangjin power station?
Dangjin power station is owned by Korea East-West Power Co Ltd. The ultimate parent company is Korea Electric Power Corp.
Where is Dangjin power station located?
It is located in South Chungcheong, South Korea. Approximate coordinates: 37.0551, 126.5113.
Is Dangjin power station operational?
According to the latest data, Dangjin power station is in operation. Operating means the facility is built and in commercial service.
When did Dangjin power station start operating?
Start year: 1999. Current status: Operating. Its 10 operating units were commissioned between 1999 and 2016. 6 further units or phases are scheduled to come online in 2029–2036. 10 operating units have a planned retirement date, the earliest in 2029.
How much electricity does Dangjin power station generate?
Actual output data are not published for every plant. As an indicative estimate, Dangjin power station would produce about 26 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is Dangjin power station compared with other facilities in South Korea?
Dangjin power station ranks #1 by capacity among 24 comparable coal facilities tracked in South Korea.