Hydropower · Venezuela

Caruachi hydroelectric plant

Caruachi hydroelectric plant is a 2.16 GW hydropower plant located in Bolivar State, Venezuela. The facility is currently in operation, with its first unit entering service in 2003.

2.16 GWCapacity
OperatingStatus
2003Start year
View on the interactive map →

Overview

Technology: conventional storage.

Ownership: Corporación Eléctrica Nacional SA.

Why it matters

  • The 3rd-largest hydropower plant in Venezuela by capacity (of 6 operating hydropower facilities tracked).
  • Provides about 13% of Venezuela's operating hydropower capacity and roughly 12% of all operating power capacity in the country in the dataset.
  • Ranks #66 worldwide among hydropower facilities of the same status group by capacity.
  • At a typical capacity factor of 40% for this technology, it would generate roughly 7.6 TWh of electricity a year (indicative estimate).

Hydropower provides renewable electricity and, where reservoirs exist, dispatchable output and storage that help stabilise the grid; output varies with rainfall and river flows.

Hydropower power in Venezuela

Venezuela has 16.0 GW of operating hydropower capacity across 6 plants in the Global Energy Monitor dataset — 89% of the country's total operating power capacity of 18.0 GW.

Other major hydropower plants in Venezuela include Guri hydroelectric plant (10.2 GW) and Macagua 2 hydroelectric plant (2.85 GW).

See the full list: Hydropower plants in Venezuela →

How hydropower plants work

Hydropower plants convert the energy of falling or flowing water into electricity: water passes through turbines placed at the foot of a dam or along a diversion channel, and the turbines drive generators. Output depends on the height of the water drop (the head) and the volume of water flowing.

Reservoir and pumped-storage schemes can store energy and release it within minutes, which makes hydropower one of the most flexible sources on the grid. Annual generation varies with rainfall and snowmelt, and large dams can have significant effects on river ecosystems and downstream water use.

Technology at Caruachi hydroelectric plant

Its reservoir allows water to be stored and power to be dispatched when it is most needed.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Caruachi hydroelectric plant is located in Bolivar State, Venezuela, at approximately 8.1609, -62.8001. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Caruachi hydroelectric plant is owned by Corporación Eléctrica Nacional SA. Across the dataset, Corporación Eléctrica Nacional SA is linked to 10 power plants with 16.0 GW of operating capacity.

Frequently asked questions

What is the capacity of Caruachi hydroelectric plant?

Caruachi hydroelectric plant has a capacity of 2.16 GW according to the latest Global Energy Monitor data.

What type of facility is Caruachi hydroelectric plant?

Caruachi hydroelectric plant is a hydropower plant. Its reservoir allows water to be stored and power to be dispatched when it is most needed.

Who owns Caruachi hydroelectric plant?

Caruachi hydroelectric plant is owned by Corporación Eléctrica Nacional SA.

Where is Caruachi hydroelectric plant located?

It is located in Bolivar State, Venezuela. Approximate coordinates: 8.1609, -62.8001.

Is Caruachi hydroelectric plant operational?

According to the latest data, Caruachi hydroelectric plant is in operation. Operating means the facility is built and in commercial service.

When did Caruachi hydroelectric plant start operating?

Start year: 2003. Current status: Operating.

How much electricity does Caruachi hydroelectric plant generate?

Actual output data are not published for every plant. As an indicative estimate, Caruachi hydroelectric plant would produce about 7.6 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.

How big is Caruachi hydroelectric plant compared with other facilities in Venezuela?

Caruachi hydroelectric plant ranks #3 by capacity among 6 comparable hydropower facilities tracked in Venezuela.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.