Overview
Global Energy Monitor tracks 5 units or phases at this site (operating 1.71 GW, planned 1.26 GW).
Technology: steam turbine, subcritical; fuel: natural gas, fossil liquids: light fuel oil, coal: subbituminous, natural gas, coal: unknown, natural gas [55%], fossil liquids: petroleum coke [45%].
Ownership: Cleco Power LLC (parent company: Cleco Group LLC).
Its 3 operating units were commissioned between 1975 and 2010. 2 further units or phases are scheduled to come online in 2027–2029. 3 operating units have a planned retirement date, the earliest in 2027.
Why it matters
- Provides about 1% of United States's operating coal capacity.
- At a typical capacity factor of 50% for this technology, it would generate roughly 7.5 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in United States
United States has 167.4 GW of operating coal capacity across 181 plants in the Global Energy Monitor dataset — 13% of the country's total operating power capacity of 1,280.9 GW.
The coal pipeline in United States includes 6.24 GW under construction and 6.81 GW at earlier planning stages.
Other major coal plants in United States include Homer City Generating Station (4.71 GW), Parish Generating Station (3.95 GW) and Plant Bowen (3.50 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 | 446 MW | steam turbine | 1975 | 2035 | |
| Unit 2, timepoint 1 | 558 MW | subcritical | 1982 | 2027 | |
| Unit 2, timepoint 2 | 558 MW | Announced | steam turbine | 2027 | 2035 |
| Unit 3, timepoint 1 | 704 MW | subcritical | 2010 | 2029 | |
| Unit 3, timepoint 2 | 704 MW | Announced | steam turbine | 2029 | 2038 |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Brame Energy power station
Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity. Steam-turbine units burn fuel in a boiler to raise steam; they are generally older and less flexible than combined-cycle plants.
Location
Brame Energy power station is located in Louisiana, United States, at approximately 31.3950, -92.7167. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Brame Energy power station is owned by Cleco Power LLC. The ultimate parent company is Cleco Group LLC. Across the dataset, Cleco Group LLC is linked to 6 power plants with 4.48 GW of operating capacity.
Frequently asked questions
What is the capacity of Brame Energy power station?
Brame Energy power station has a capacity of 1.71 GW according to the latest Global Energy Monitor data. This figure covers the 5 units or phases listed for the site.
What type of facility is Brame Energy power station?
Brame Energy power station is a coal-fired power station. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Who owns Brame Energy power station?
Brame Energy power station is owned by Cleco Power LLC. The ultimate parent company is Cleco Group LLC.
Where is Brame Energy power station located?
It is located in Louisiana, United States. Approximate coordinates: 31.3950, -92.7167.
Is Brame Energy power station operational?
According to the latest data, Brame Energy power station is in operation. Operating means the facility is built and in commercial service.
When did Brame Energy power station start operating?
Start year: 1975. Current status: Operating. Its 3 operating units were commissioned between 1975 and 2010. 2 further units or phases are scheduled to come online in 2027–2029. 3 operating units have a planned retirement date, the earliest in 2027.
How much electricity does Brame Energy power station generate?
Actual output data are not published for every plant. As an indicative estimate, Brame Energy power station would produce about 7.5 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is Brame Energy power station compared with other facilities in United States?
Brame Energy power station ranks #31 by capacity among 181 comparable coal facilities tracked in United States.