Overview
GEM tracks 4 units or phases at this site (operating 148 MW).
Technology: Onshore.
Ownership: Japan Wind Engineering Co Ltd; Renova Inc; Shinobuyama Fukushima Power Co Ltd; Shimizu Corp; Sumitomo Corp; JR-East Energy CO LTD (JED); Fukushima Electric Power Co Ltd; Fukushima Mirai Kenkyukai; Obayashi Clean Energy….
Why it matters
- The largest wind farm in Japan by capacity, out of 172 operating wind facilities tracked in the country.
- Provides about 2.7% of Japan's operating wind capacity.
- Wind output varies with weather, so large wind farms depend on transmission capacity and system flexibility to deliver their power to demand centres.
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 | 37 MW | Onshore | 2025 | ||
| 2 | 37 MW | Onshore | 2025 | ||
| 3 | 37 MW | Onshore | 2025 | ||
| 4 | 37 MW | Onshore | 2025 |
Location
Frequently asked questions
What is the capacity of Abukuma wind power plant?
Abukuma wind power plant has a capacity of 148 MW according to the latest Global Energy Monitor data.
Who owns Abukuma wind power plant?
Japan Wind Engineering Co Ltd; Renova Inc; Shinobuyama Fukushima Power Co Ltd; Shimizu Corp; Sumitomo Corp; JR-East Energy CO LTD (JED); Fukushima Electric Power Co Ltd; Fukushima Mirai Kenkyukai; Obayashi Clean Energy Corp.
Where is Abukuma wind power plant located?
It is located in Japan. Approximate coordinates: 37.4086, 140.8556.
When did Abukuma wind power plant start operating?
Start year: 2025. Current status: Operating.