LNG import terminal · China

Yancheng LNG Terminal

Yancheng LNG Terminal is a 20.0 mtpa LNG import (regasification) terminal in Jiangsu, China. It is currently in operation, with operations starting in 2022.

20.0 mtpaCapacity
OperatingStatus
2022Start year
View on the interactive map →

Overview

The tracker lists 4 trains, units or expansion phases at the terminal.

Capacity is expressed in million tonnes per annum (mtpa) of LNG that can be received and regasified.

One mtpa of LNG corresponds to roughly 1.36 billion cubic metres of natural gas per year, so this capacity equals about 27.2 bcm/y of gas.

Ownership: CNOOC Gas and Power Group Jiangsu Natural Gas Co Ltd (parent company: China National Offshore Oil Corp; Huaihe Energy Holding Group Co Ltd; other; China Cinda Asset Management Co Ltd).

Its 2 operating units were commissioned between 2022 and 2024.

Why it matters

  • The largest LNG import (regasification) terminal in China by capacity, out of 32 operating lng import terminal facilities tracked in the country.
  • Ranks #13 worldwide among lng import terminal facilities of the same status group by capacity.

Import terminals regasify liquefied natural gas delivered by tanker and inject it into the grid, giving countries access to seaborne gas supply from many exporters.

LNG terminals in China

The dataset tracks 65 lng terminals in China, including operating, planned and shelved projects.

China has 221.0 mtpa of operating LNG import capacity across 32 terminals.

See the full list: LNG terminals in China →

Trains and phases

Unit / phaseCapacityStatusTechnologyStartRetired
Phase 3 10.0 mtpa Proposed
Phase 2 4.00 mtpa Proposed
Phase 1 Expansion 3.00 mtpa Operating 2024
Phase 1 3.00 mtpa Operating 2022

How lng terminals work

An LNG import terminal receives liquefied natural gas from tankers, stores it at around −162 °C in insulated tanks and warms it back into gas (regasification) before sending it into the pipeline grid. Many newer terminals are floating storage and regasification units (FSRUs), which can be installed much faster than onshore plants.

Import terminals give countries access to gas from many exporters worldwide, improving supply security and price competition — a role that became especially visible in Europe after 2022.

Location

Location is approximate. Imagery © Esri, Maxar, Earthstar Geographics

Yancheng LNG Terminal is located in Jiangsu, China, at approximately 34.2740, 120.2682. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Yancheng LNG Terminal is owned by CNOOC Gas and Power Group Jiangsu Natural Gas Co Ltd. The ultimate parent company is China National Offshore Oil Corp; Huaihe Energy Holding Group Co Ltd; other; China Cinda Asset Management Co Ltd. Across the dataset, China National Offshore Oil Corp is linked to 2 lng terminals.

Frequently asked questions

What is the capacity of Yancheng LNG Terminal?

Yancheng LNG Terminal has a capacity of 20.0 mtpa according to the latest Global Energy Monitor data. This figure covers the 4 units or phases listed for the site.

What type of facility is Yancheng LNG Terminal?

Yancheng LNG Terminal is a LNG import (regasification) terminal.

Who owns Yancheng LNG Terminal?

Yancheng LNG Terminal is owned by CNOOC Gas and Power Group Jiangsu Natural Gas Co Ltd. The ultimate parent company is China National Offshore Oil Corp; Huaihe Energy Holding Group Co Ltd; other; China Cinda Asset Management Co Ltd.

Where is Yancheng LNG Terminal located?

It is located in Jiangsu, China. Approximate coordinates: 34.2740, 120.2682.

Is Yancheng LNG Terminal operational?

According to the latest data, Yancheng LNG Terminal is in operation. Operating means the facility is built and in commercial service.

When did Yancheng LNG Terminal start operating?

Start year: 2022. Current status: Operating. Its 2 operating units were commissioned between 2022 and 2024.

How big is Yancheng LNG Terminal compared with other facilities in China?

Yancheng LNG Terminal ranks #1 by capacity among 32 comparable lng import terminal facilities tracked in China.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Gas Infrastructure Tracker, 2025-11 release. Full project profile on GEM.wiki. Last updated: 9 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects