LNG import terminal · China

Longkou Nanshan LNG Terminal

Longkou Nanshan LNG Terminal is a 20.5 mtpa LNG import (regasification) terminal in Shandong, China. It is currently under construction.

20.5 mtpaCapacity
ConstructionStatus
View on the interactive map →

Overview

The tracker lists 2 trains, units or expansion phases at the terminal.

Capacity is expressed in million tonnes per annum (mtpa) of LNG that can be received and regasified.

One mtpa of LNG corresponds to roughly 1.36 billion cubic metres of natural gas per year, so this capacity equals about 27.8 bcm/y of gas.

Ownership: National Pipe Network Group Nanshan (Shandong) Natural Gas Co Ltd (parent company: National Petroleum and Natural Gas Pipeline Network Group Co Ltd; Nanshan Group Co Ltd).

Why it matters

  • The largest LNG import (regasification) terminal in China by capacity, out of 53 operating, under-construction and planned lng import terminal facilities tracked in the country.
  • Ranks #13 worldwide among lng import terminal facilities of the same status group by capacity.

Import terminals regasify liquefied natural gas delivered by tanker and inject it into the grid, giving countries access to seaborne gas supply from many exporters.

LNG terminals in China

The dataset tracks 65 lng terminals in China, including operating, planned and shelved projects.

China has 221.0 mtpa of operating LNG import capacity across 32 terminals.

See the full list: LNG terminals in China →

Trains and phases

Unit / phaseCapacityStatusTechnologyStartRetired
Phase 2 and 3 14.0 mtpa Proposed
Phase 1 6.45 mtpa Construction

How lng terminals work

An LNG import terminal receives liquefied natural gas from tankers, stores it at around −162 °C in insulated tanks and warms it back into gas (regasification) before sending it into the pipeline grid. Many newer terminals are floating storage and regasification units (FSRUs), which can be installed much faster than onshore plants.

Import terminals give countries access to gas from many exporters worldwide, improving supply security and price competition — a role that became especially visible in Europe after 2022.

Location

Location is approximate. Imagery © Esri, Maxar, Earthstar Geographics

Longkou Nanshan LNG Terminal is located in Shandong, China, at approximately 37.6808, 120.2203. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Longkou Nanshan LNG Terminal is owned by National Pipe Network Group Nanshan (Shandong) Natural Gas Co Ltd. The ultimate parent company is National Petroleum and Natural Gas Pipeline Network Group Co Ltd; Nanshan Group Co Ltd. Across the dataset, National Petroleum and Natural Gas Pipeline Network Group Co Ltd is linked to 8 lng terminals.

Frequently asked questions

What is the capacity of Longkou Nanshan LNG Terminal?

Longkou Nanshan LNG Terminal has a capacity of 20.5 mtpa according to the latest Global Energy Monitor data. This figure covers the 2 units or phases listed for the site.

What type of facility is Longkou Nanshan LNG Terminal?

Longkou Nanshan LNG Terminal is a LNG import (regasification) terminal.

Who owns Longkou Nanshan LNG Terminal?

Longkou Nanshan LNG Terminal is owned by National Pipe Network Group Nanshan (Shandong) Natural Gas Co Ltd. The ultimate parent company is National Petroleum and Natural Gas Pipeline Network Group Co Ltd; Nanshan Group Co Ltd.

Where is Longkou Nanshan LNG Terminal located?

It is located in Shandong, China. Approximate coordinates: 37.6808, 120.2203.

Is Longkou Nanshan LNG Terminal operational?

According to the latest data, Longkou Nanshan LNG Terminal is under construction. Under construction means physical work has started on site but the facility is not yet in commercial service.

How big is Longkou Nanshan LNG Terminal compared with other facilities in China?

Longkou Nanshan LNG Terminal ranks #1 by capacity among 53 comparable lng import terminal facilities tracked in China.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Gas Infrastructure Tracker, 2025-11 release. Full project profile on GEM.wiki. Last updated: 9 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects