LNG import terminal · Japan

Shin Minato LNG Terminal

Shin Minato LNG Terminal is a 0.30 mtpa LNG import (regasification) terminal in Tohoku, Japan. It is currently in operation, with operations starting in 1997.

0.30 mtpaCapacity
OperatingStatus
1997Start year
View on the interactive map →

Overview

Capacity is expressed in million tonnes per annum (mtpa) of LNG that can be received and regasified.

One mtpa of LNG corresponds to roughly 1.36 billion cubic metres of natural gas per year, so this capacity equals about 0.4 bcm/y of gas.

Ownership: City of Sendai Gas Bureau.

Why it matters

Import terminals regasify liquefied natural gas delivered by tanker and inject it into the grid, giving countries access to seaborne gas supply from many exporters.

LNG terminals in Japan

The dataset tracks 45 lng terminals in Japan, including operating, planned and shelved projects.

Japan has 242.2 mtpa of operating LNG import capacity across 45 terminals.

See the full list: LNG terminals in Japan →

How lng terminals work

An LNG import terminal receives liquefied natural gas from tankers, stores it at around −162 °C in insulated tanks and warms it back into gas (regasification) before sending it into the pipeline grid. Many newer terminals are floating storage and regasification units (FSRUs), which can be installed much faster than onshore plants.

Import terminals give countries access to gas from many exporters worldwide, improving supply security and price competition — a role that became especially visible in Europe after 2022.

Location

Location is approximate. Imagery © Esri, Maxar, Earthstar Geographics

Shin Minato LNG Terminal is located in Tohoku, Japan, at approximately 38.2801, 141.0260. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Shin Minato LNG Terminal is owned by City of Sendai Gas Bureau. Across the dataset, City of Sendai Gas Bureau is linked to 2 lng terminals.

Frequently asked questions

What is the capacity of Shin Minato LNG Terminal?

Shin Minato LNG Terminal has a capacity of 0.30 mtpa according to the latest Global Energy Monitor data.

What type of facility is Shin Minato LNG Terminal?

Shin Minato LNG Terminal is a LNG import (regasification) terminal.

Who owns Shin Minato LNG Terminal?

Shin Minato LNG Terminal is owned by City of Sendai Gas Bureau.

Where is Shin Minato LNG Terminal located?

It is located in Tohoku, Japan. Approximate coordinates: 38.2801, 141.0260.

Is Shin Minato LNG Terminal operational?

According to the latest data, Shin Minato LNG Terminal is in operation. Operating means the facility is built and in commercial service.

When did Shin Minato LNG Terminal start operating?

Start year: 1997. Current status: Operating.

How big is Shin Minato LNG Terminal compared with other facilities in Japan?

Shin Minato LNG Terminal ranks #42 by capacity among 45 comparable lng import terminal facilities tracked in Japan.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Gas Infrastructure Tracker, 2025-11 release. Full project profile on GEM.wiki. Last updated: 9 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects