LNG import terminal · France

Fos Cavaou LNG Terminal

Fos Cavaou LNG Terminal is a 10.0 mtpa LNG import (regasification) terminal in Provence-Alpes-Côte d'Azur, France. It is currently in operation, with operations starting in 2010.

10.0 mtpaCapacity
OperatingStatus
2010Start year
View on the interactive map →

Overview

The tracker lists 3 trains, units or expansion phases at the terminal.

Capacity is expressed in million tonnes per annum (mtpa) of LNG that can be received and regasified.

One mtpa of LNG corresponds to roughly 1.36 billion cubic metres of natural gas per year, so this capacity equals about 13.6 bcm/y of gas.

Ownership: Fosmax LNG SAS (parent company: Elengy).

Its 2 operating units were commissioned between 2010 and 2023.

Why it matters

  • The largest LNG import (regasification) terminal in France by capacity, out of 5 operating lng import terminal facilities tracked in the country.
  • Ranks #39 worldwide among lng import terminal facilities of the same status group by capacity.

Import terminals regasify liquefied natural gas delivered by tanker and inject it into the grid, giving countries access to seaborne gas supply from many exporters.

LNG terminals in France

The dataset tracks 5 lng terminals in France, including operating, planned and shelved projects.

France has 34.5 mtpa of operating LNG import capacity across 5 terminals.

See the full list: LNG terminals in France →

Trains and phases

Unit / phaseCapacityStatusTechnologyStartRetired
— 8.00 mtpa Operating 2010
Expansion 2 2.00 mtpa Construction
Expansion 1 (Debottlenecking) Operating 2023

How lng terminals work

An LNG import terminal receives liquefied natural gas from tankers, stores it at around −162 °C in insulated tanks and warms it back into gas (regasification) before sending it into the pipeline grid. Many newer terminals are floating storage and regasification units (FSRUs), which can be installed much faster than onshore plants.

Import terminals give countries access to gas from many exporters worldwide, improving supply security and price competition — a role that became especially visible in Europe after 2022.

Location

Location is approximate. Imagery © Esri, Maxar, Earthstar Geographics

Fos Cavaou LNG Terminal is located in Provence-Alpes-Côte d'Azur, France, at approximately 43.4196, 4.9010. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Fos Cavaou LNG Terminal is owned by Fosmax LNG SAS. The ultimate parent company is Elengy. Across the dataset, Elengy is linked to 3 lng terminals.

Frequently asked questions

What is the capacity of Fos Cavaou LNG Terminal?

Fos Cavaou LNG Terminal has a capacity of 10.0 mtpa according to the latest Global Energy Monitor data. This figure covers the 3 units or phases listed for the site.

What type of facility is Fos Cavaou LNG Terminal?

Fos Cavaou LNG Terminal is a LNG import (regasification) terminal.

Who owns Fos Cavaou LNG Terminal?

Fos Cavaou LNG Terminal is owned by Fosmax LNG SAS. The ultimate parent company is Elengy.

Where is Fos Cavaou LNG Terminal located?

It is located in Provence-Alpes-Côte d'Azur, France. Approximate coordinates: 43.4196, 4.9010.

Is Fos Cavaou LNG Terminal operational?

According to the latest data, Fos Cavaou LNG Terminal is in operation. Operating means the facility is built and in commercial service.

When did Fos Cavaou LNG Terminal start operating?

Start year: 2010. Current status: Operating. Its 2 operating units were commissioned between 2010 and 2023.

How big is Fos Cavaou LNG Terminal compared with other facilities in France?

Fos Cavaou LNG Terminal ranks #1 by capacity among 5 comparable lng import terminal facilities tracked in France.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Gas Infrastructure Tracker, 2025-11 release. Full project profile on GEM.wiki. Last updated: 9 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects