Hydropower plants in Uganda
This list ranks all 11 hydropower plants tracked in Uganda by capacity, including operating, under-construction, planned, shelved and retired projects. 7 of them are operating, with a combined capacity of 1.50 GW.
Open the interactive map →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Ayago hydroelectric plantKiryandongo | Hydropower | 840 MW | Pre-construction | |
| 2 | Karuma hydroelectric plantKiryandongo | Hydropower | 600 MW | 2023 | |
| 3 | Kiba hydroelectric plantKiryandongo | Hydropower | 400 MW | Pre-construction | |
| 4 | Oriang hydroelectric plantKiryandongo | Hydropower | 392 MW | Announced | |
| 5 | Bujagali hydroelectric plantBuikwe | Hydropower | 250 MW | 2012 | |
| 6 | Kiira hydroelectric plant | Hydropower | 200 MW | 2003 | |
| 7 | Isimba hydroelectric plantKayunga | Hydropower | 183 MW | 2019 | |
| 8 | Nalubaale hydroelectric plantBuikwe | Hydropower | 180 MW | 1954 | |
| 9 | Muzizi hydroelectric plantKyenjojo | Hydropower | 48 MW | Announced | |
| 10 | Achwa I hydroelectric plantPader | Hydropower | 42 MW | 2021 | |
| 11 | Achwa II hydroelectric plantPader | Hydropower | 42 MW | 2021 |