Hydropower plants in Uganda

This list ranks all 11 hydropower plants tracked in Uganda by capacity, including operating, under-construction, planned, shelved and retired projects. 7 of them are operating, with a combined capacity of 1.50 GW.

Open the interactive map →
#NameTypeCapacityStatusStart
1Ayago hydroelectric plantKiryandongoHydropower840 MWPre-construction
2Karuma hydroelectric plantKiryandongoHydropower600 MWOperating2023
3Kiba hydroelectric plantKiryandongoHydropower400 MWPre-construction
4Oriang hydroelectric plantKiryandongoHydropower392 MWAnnounced
5Bujagali hydroelectric plantBuikweHydropower250 MWOperating2012
6Kiira hydroelectric plantHydropower200 MWOperating2003
7Isimba hydroelectric plantKayungaHydropower183 MWOperating2019
8Nalubaale hydroelectric plantBuikweHydropower180 MWOperating1954
9Muzizi hydroelectric plantKyenjojoHydropower48 MWAnnounced
10Achwa I hydroelectric plantPaderHydropower42 MWOperating2021
11Achwa II hydroelectric plantPaderHydropower42 MWOperating2021

Special projects