Bioenergy power plants in Uganda
This list ranks all 6 bioenergy power plants tracked in Uganda by capacity, including operating, under-construction, planned, shelved and retired projects. 4 of them are operating, with a combined capacity of 87 MW.
Open the interactive map →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Kampala Waste to Energy power stationKampala | Bioenergy | 40 MW | Pre-construction | |
| 2 | Lugazi Sugar power stationBuikwe | Bioenergy | 36 MW | ||
| 3 | NLS Waste power stationMukono | Bioenergy | 35 MW | Pre-construction | 2029 |
| 4 | Kakira Sugar power stationJinja | Bioenergy | 30 MW | 2014 | |
| 5 | Kaliro Sugar power stationKaliro | Bioenergy | 12 MW | 2013 | |
| 6 | Mayuge Sugar power stationMayuge | Bioenergy | 9.2 MW |