Gas pipelines in Turkmenistan

This list ranks all 21 gas pipelines tracked in Turkmenistan by capacity, including operating, under-construction, planned, shelved and retired projects. 12 of them are operating, with a combined capacity of 317 bcm/y.

Open the interactive map →
#NameTypeCapacityStatusStart
1Central Asia–Center Gas PipelineMaryGas pipeline60.2 bcm/yOperating1985
2Central Asia–Center Gas PipelineMaryGas pipeline60.2 bcm/yOperating1976
3Central Asia–Center Gas PipelineMaryGas pipeline60.2 bcm/yOperating1970
4Turkmenistan-Afghanistan-Pakistan-India Gas PipelineAhalGas pipeline33.0 bcm/yConstruction
5Central Asia–China Gas PipelineGas pipeline30.0 bcm/yShelved2022
6East-West Gas PipelineMaryGas pipeline30.0 bcm/yOperating2015
7Dowletabat-Deryalyk Gas PipelineGas pipeline25.6 bcm/yOperating
8Central Asia–China Gas PipelineGas pipeline25.0 bcm/yOperating2014
9Bukhara-Ural Gas PipelineBukhara RegionGas pipeline21.0 bcm/yOperating1966
10Bukhara-Ural Gas PipelineBukhara RegionGas pipeline21.0 bcm/yOperating1963
11Dauletabad-Sarakhs-Khangiran Gas PipelineAhal ProvinceGas pipeline19.5 bcm/yProposed
12Trans-Caspian Gas PipelineBalkanGas pipeline16.0 bcm/yProposed2029
13Central Asia–China Gas PipelineGas pipeline15.0 bcm/yOperating2010
14Central Asia–China Gas PipelineGas pipeline15.0 bcm/yOperating2009
15Dauletabad-Sarakhs-Khangiran Gas PipelineAhal ProvinceGas pipeline12.5 bcm/yOperating2010
16Korpeje-Kordkuy Gas PipelineGas pipeline8.00 bcm/yOperating1997
17Central Asia–Center Gas PipelineMangystauGas pipeline5.00 bcm/yOperating1975
18Okarem-Beyneu Gas PipelineBalkanGas pipeline3.78 bcm/yOperating1974
19Kelif-Dushanbe Gas PipelineGas pipelineOperating1975
20Kelif-Mubarek Gas PipelineGas pipelineOperating
21Naiyp-Deryalyk Gas PipelineGas pipelineOperating

Special projects