Geothermal power plants in Tanzania
This list ranks all 5 geothermal power plants tracked in Tanzania by capacity, including operating, under-construction, planned, shelved and retired projects.
Open the interactive map →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Ngozi geothermal power plantMbeya Region | Geothermal | 70 MW | Construction | 2027 |
| 2 | Kiejo-Mbaka geothermal power plant | Geothermal | 60 MW | Announced | |
| 3 | Natron geothermal power plant | Geothermal | 60 MW | Announced | |
| 4 | Songwe geothermal power plant | Geothermal | 38 MW | Announced | |
| 5 | Luhoi geothermal power plant | Geothermal | 5.0 MW | Announced | 2029 |