Wind farms in Spain (page 25)

This list ranks all 1,710 wind farms tracked in Spain by capacity, including operating, under-construction, planned, shelved and retired projects. 860 of them are operating, with a combined capacity of 31.0 GW.

Open the interactive map →
#NameTypeCapacityStatusStart
1201Contrebias 1 wind farmAragónWind24 MWPre-construction
1202Coriscada wind farmGaliciaWind24 MWOperating2000
1203Cova Da Serpe wind farmGaliciaWind24 MWOperating2009
1204Echagüe wind farmComunidad Foral de NavarraWind24 MWOperating1999
1205El Gallego wind farmAndalucíaWind24 MWOperating2005
1206El Marquesado wind farmAndalucíaWind24 MWOperating2019
1207El Nogal wind farm (Spain)Castile and LeónWind24 MWOperating2010
1208El Páramo wind farmCastile and LeónWind24 MWOperating
1209El Pino wind farmAndalucíaWind24 MWOperating2006
1210Elgea wind farmWind24 MWOperating2000
1211Faladoira wind farmGaliciaWind24 MWOperating2002
1212Fermio wind farmAragónWind24 MWPre-construction
1213Fiouco wind farmGaliciaWind24 MWOperating2005
1214Forgoselo (Iberdrola) wind farmGaliciaWind24 MWOperating2000
1215Fréscano wind farmAragónWind24 MWOperating2019
1216Halio wind farmAragónWind24 MWPre-construction
1217Jenáriz wind farmComunidad Foral de NavarraWind24 MWOperating2024
1218Joluga wind farmComunidad Foral de NavarraWind24 MWPre-construction
1219La Colina wind farmAndalucíaWind24 MWPre-construction
1220La Escalereta wind farmAndalucíaWind24 MWOperating2020
1221La Estanca wind farmAragónWind24 MWOperating2019
1222La Magdalena wind farmCastile and LeónWind24 MWOperating2004
1223La Tejería wind farmComunidad Foral de NavarraWind24 MWShelved
1224Lanternoso wind farmCastilla-La ManchaWind24 MWOperating
1225Loma Gorda (Enel Green Power) wind farmAragónWind24 MWOperating2019
1226Los Bolaños wind farmAndalucíaWind24 MWOperating2008
1227Los Granujales wind farmAndalucíaWind24 MWOperating2011
1228Los Labrados wind farmAragónWind24 MWOperating2002
1229Losilla wind farmComunidad ValencianaWind24 MWOperating2009
1230Miñón wind farmGaliciaWind24 MWOperating2019
1231Montañés wind farmAragónWind24 MWConstruction
1232Monte Villalbesa wind farmGaliciaWind24 MWOperating2000
1233Nacimiento wind farmAndalucíaWind24 MWOperating2008
1234Olerón (Norvento Enerxía) wind farmGaliciaWind24 MWPre-construction
1235Parrancanas wind farmAndalucíaWind24 MWPre-construction
1236Pena Da Loba wind farmGaliciaWind24 MWOperating2002
1237Pico Gallo wind farmAsturiasWind24 MWOperating2001
1238Plana De La Balsa wind farmAragónWind24 MWOperating2002
1239Plana De María wind farmAragónWind24 MWOperating2002
1240Plana De Zaragosa wind farmAragónWind24 MWOperating2002
1241Pousadoiro-Fonesca wind farmGaliciaWind24 MWOperating2008
1242Pozocañada wind farmCastilla-La ManchaWind24 MWOperating2001
1243Robres wind farmAragónWind24 MWOperating2007
1244San Francisco De Borja wind farmAragónWind24 MWOperating2021
1245Sargentes wind farmCastile and LeónWind24 MWOperating2009
1246Serra Do Cando wind farmGaliciaWind24 MWOperating2000
1247Sierra Del Romeral wind farmCastilla-La ManchaWind24 MWOperating2003
1248Solpor wind farmGaliciaWind24 MWPre-construction
1249Torviscal wind farmCastilla-La ManchaWind24 MWOperating2006
1250Touriñán (Greenalia) wind farmGaliciaWind24 MWPre-construction

Special projects