LNG terminals in Russia
This list ranks all 22 lng terminals tracked in Russia by capacity, including operating, under-construction, planned, shelved and retired projects. 5 of them are operating, with a combined capacity of 57.2 mtpa.
Open the interactive map →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Taimyr LNG TerminalKrasnoyarsk Krai | LNG export terminal | 50.0 mtpa | Proposed | |
| 2 | Kara LNG Terminal | LNG export terminal | 22.5 mtpa | Proposed | |
| 3 | Murmansk LNG TerminalMurmansk Oblast | LNG export terminal | 20.4 mtpa | Proposed | |
| 4 | Tambey LNG Terminal | LNG export terminal | 20.0 mtpa | Proposed | |
| 5 | Arctic LNG 1 Terminal | LNG export terminal | 19.8 mtpa | Proposed | |
| 6 | Arctic LNG 2 Terminal | LNG export terminal | 19.8 mtpa | 2023 | |
| 7 | Arctic LNG 3 Terminal | LNG export terminal | 19.8 mtpa | Shelved | |
| 8 | Ust Luga LNG TerminalLeningrad Oblast | LNG export terminal | 19.6 mtpa | Construction | |
| 9 | Yamal LNG TerminalYamai Peninsula | LNG export terminal | 17.4 mtpa | 2017 | |
| 10 | Far East LNG TerminalKhabaravosk Krai | LNG export terminal | 16.2 mtpa | Proposed | |
| 11 | Sakhalin II LNG TerminalSakhalin | LNG export terminal | 15.0 mtpa | 2009 | |
| 12 | Yakutia LNG ProjectKhabarovsk Krai | LNG export terminal | 9.00 mtpa | Proposed | |
| 13 | Valentina LNG TerminalPrimorsky Krai | LNG export terminal | 7.00 mtpa | Proposed | |
| 14 | Obsky LNG TerminalYamai Peninsula | LNG export terminal | 4.80 mtpa | Proposed | |
| 15 | Marshal Vasilevskiy FSRUKaliningrad Oblast | LNG import terminal | 3.76 mtpa | Idled | 2019 |
| 16 | Portovaya LNG TerminalLeningrad Oblast | LNG export terminal | 3.50 mtpa | 2022 | |
| 17 | Chernomorsky LNG TerminalKrasnodar Krai | LNG export terminal | 1.50 mtpa | Shelved | |
| 18 | Vysotsk LNG TerminalLeningrad Oblast | LNG export terminal | 1.50 mtpa | 2019 | |
| 19 | LNG Yakutia TerminalSakha Republic | LNG export terminal | 0.53 mtpa | Proposed | |
| 20 | Arkhangelsk LNG TerminalArkhangelsk Oblast | LNG export terminal | 0.16 mtpa | Proposed | |
| 21 | Khabarovskiy LNG TerminalKhabarovsk Krai | LNG export terminal | 0.08 mtpa | Proposed | |
| 22 | Aurora Spassk-Dalny LNG TerminalPrimorsky Krai | LNG export terminal | 0.04 mtpa | Proposed |