Gas pipelines in Russia

This list ranks all 267 gas pipelines tracked in Russia by capacity, including operating, under-construction, planned, shelved and retired projects. 166 of them are operating, with a combined capacity of 2,063 bcm/y.

Open the interactive map →
#NameTypeCapacityStatusStart
1Zapolyarnoye-Novy Urengoy Gas PipelineYamalo-Nenets Autonomus OkrugGas pipeline100 bcm/yOperating2004
2Ring of the Moscow Region Gas PipelineMoscow OblastGas pipeline90.0 bcm/yOperating
3Gryazovets-Volkhov-Slavyanskaya Gas PipelineVologda OblastGas pipeline84.2 bcm/yOperating2022
4Bovanenkovo-Ukhta Gas PipelineYamalo-Nenets Autonomus OkrugGas pipeline69.2 bcm/yConstruction2024
5Pisarevka-Anapa Gas PipelineVoronezh OblastGas pipeline63.0 bcm/yOperating2016
6Pochinki-Anapa Gas PipelineNizhgorod OblastGas pipeline63.0 bcm/yConstruction2023
7Central Asia–Center Gas PipelineMaryGas pipeline60.2 bcm/yOperating1985
8Central Asia–Center Gas PipelineMaryGas pipeline60.2 bcm/yOperating1976
9Central Asia–Center Gas PipelineMaryGas pipeline60.2 bcm/yOperating1970
10Bovanenkovo-Ukhta Gas PipelineYamalo-Nenets Autonomus OkrugGas pipeline60.0 bcm/yProposed
11Bovanenkovo-Ukhta Gas PipelineYamalo-Nenets Autonomus OkrugGas pipeline60.0 bcm/yConstruction
12Bovanenkovo-Ukhta Gas PipelineYamalo-Nenets Autonomus OkrugGas pipeline60.0 bcm/yProposed
13Urengoy-Chelyabinsk Gas PipelineYamalo-Nenets Autonomus OkrugGas pipeline58.0 bcm/yOperating1979
14Bovanenkovo-Ukhta Gas PipelineYamalo-Nenets Autonomous OkrugGas pipeline57.5 bcm/yOperating2012
15Bovanenkovo-Ukhta Gas PipelineYamalo-Nenets Autonomous OkrugGas pipeline57.5 bcm/yOperating2017
16Gryazovets-Vyborg Gas PipelineVologda OblastGas pipeline55.0 bcm/yOperating2011
17Gryazovets-Vyborg Gas PipelineVologda OblastGas pipeline55.0 bcm/yOperating2012
18Nord Stream 2 Gas PipelineLeningrad OblastGas pipeline55.0 bcm/yMothballed2022
19Nord Stream Gas PipelineLeningrad OblastGas pipeline55.0 bcm/yMothballed2011
20Russia–Iran Gas PipelineGas pipeline55.0 bcm/yConstruction
21Power of Siberia 2 Gas PipelineRepublic of BuryatiaGas pipeline50.0 bcm/yProposed2030
22Power of Siberia 2 Gas PipelineYamalo-Nenets Autonomous OkrugGas pipeline50.0 bcm/yProposed2030
23Russia-Kazakhstan-China Gas PipelineAltai territoryGas pipeline45.0 bcm/yProposed
24Ukhta-Torzhok (Yamal) 2 Gas PipelineRepublic of KomiGas pipeline45.0 bcm/yOperating2018
25Ukhta-Torzhok (Yamal) 3 Gas PipelineRepublic of KomiGas pipeline45.0 bcm/yProposed2024
26Ukhta-Torzhok (Yamal) Gas PipelineRepublic of KomiGas pipeline45.0 bcm/yOperating2012
27Murmansk-Volkhov Gas PipelineMurmansk OblastGas pipeline41.2 bcm/yProposed2028
28Torzhok-Minsk-Ivatsevichy Gas PipelineGas pipeline40.0 bcm/yOperating1978
29Torzhok-Minsk-Ivatsevichy Gas PipelineGas pipeline40.0 bcm/yOperating1983
30Torzhok-Minsk-Ivatsevichy Gas PipelineGas pipeline40.0 bcm/yOperating1974
31Volkhov-Segezha-Kostomuksha Gas PipelineRepublic of KareliaGas pipeline40.0 bcm/yProposed
32Volkhov-Segezha-Kostomuksha Gas PipelineRepublic of KareliaGas pipeline40.0 bcm/yProposed
33Volkhov-Segezha-Kostomuksha Gas PipelineLeningrad OblastGas pipeline40.0 bcm/yProposed
34Tambeyskoye-Bovanenkovo Gas PipelineYamalo-Nenets Autonomus OkrugGas pipeline38.4 bcm/yProposed2028
35Power of Siberia Gas PipelineGas pipeline38.0 bcm/yOperating2022
36Power of Siberia Gas PipelineGas pipeline38.0 bcm/yOperating2019
37Chelyabinsk-Petrovsk Gas PipelineChelyabinsk regionGas pipeline37.1 bcm/yOperating1980
38Ukhta-Cheboksary Gas PipelineRepublic of KomiGas pipeline37.0 bcm/yShelved
39Pochinki-Yaroslavl Gas PipelineNizhny Novgorod OblastGas pipeline36.0 bcm/yOperating
40Yelets-Kremenchuk–Kryvyi Rih Gas PipelineLipetsk OblastGas pipeline34.7 bcm/yOperating1986
41Yamal-Europe Gas PipelineTverGas pipeline33.0 bcm/yIdled1999
42SRTO-Surgut-Omsk Gas PipelineYamalo-Nenets Autonomous OkrugGas pipeline32.8 bcm/yOperating1989
43Urengoy-Center Gas PipelineYamalo-Nenets Autonomous OkrugGas pipeline32.5 bcm/yOperating1984
44Urengoy-Center Gas PipelineYamalo-Nenets Autonomous OkrugGas pipeline32.5 bcm/yOperating1985
45Yamburg-Volga Region Gas PipelineYamalo-Nenets Autonomous OkrugGas pipeline32.5 bcm/yOperating1990
46Kharasaveyskoye–Bovanenkovskoye Gas PipelineYamalo-Nenets Autonomus OkrugGas pipeline32.0 bcm/yConstruction2024
47Urengoy-Petrovsk Gas PipelineYamalo-Nenets Autonomous OkrugGas pipeline32.0 bcm/yOperating1983
48Urengoy-Pomary-Uzhgorod Gas PipelineYamalo-Nenets Autonomous OkrugGas pipeline32.0 bcm/yOperating1983
49Urengoy-Novopskov Gas PipelineYamalo-Nenets Autonomous OkrugGas pipeline31.0 bcm/yOperating1982
50Nadym-Punga Gas PipelineYamalo-Nenets Autonomus OkrugGas pipeline30.0 bcm/yOperating1981

Special projects